Lessons Learned – Lining Asbestos Cement Sewer Main

机译:获得的经验教训–衬石棉水泥下水道主管

获取原文
获取原文并翻译 | 示例

摘要

This paper presents information on the investigation and lessons-learned during recentrncured-in-place (CIP) lining project in which the host pipe was an asbestos cement (AC)rnsewer main.rnDue to deterioration of the main, swelling of the AC material resulted in reduction of therninside diameter of the pipe. Upon installation and curing of the liner material, wrinklesrnwere noted during the follow-up inspection.rnMaterial testing and inspection were conducted to determine what, if any, impacts thernwrinkling would have on the pipe's integrity.rnThis paper examines the process of installing the CIP liner, examination of the finalrnproduct and the resulting impacts of the wrinkles.
机译:本文介绍了有关最近就地浇筑(CIP)衬砌项目的调查和经验教训,在该项目中,主管是石棉水泥(AC)污水管的主体。rn由于主管道的劣化,导致AC材料膨胀减少管子的内径。在衬管材料安装和固化后,在后续检查中会发现皱纹。rn进行了材料测试和检查,以确定是否有皱纹会对管的完整性造成影响。rn本文研究了CIP衬管的安装过程,检查最终产品及其产生的皱纹影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号