Geotechnical Design And Construction Issues For Guanella Dam, Near Empire, Colorado

机译:Guanella大坝,帝国,科罗拉多州附近的岩土设计与施工问题

获取原文

摘要

Guanella Dam is a new 34-foot (10-meter) high, zoned earthfill embankment dam completed in the fall of 2003 and put into service in 2004. The dam was designed and constructed using a fast-track approach to meet water needs of the City of Golden. The dam is located near Empire, CO at the site of a previous aggregate quarry operation. The off-channel reservoir created by the dam will impound a water supply of about 2,140 acre-feet (2.64 million cubic meters). Several unique site conditions presented interesting geotechnical challenges that had to be overcome to develop a successful project. The site stratigraphy varied significantly over short distances, and the dam alignment was carefully selected to take advantage of a high ridge in a low permeability silt layer. On-site soils had to be carefully evaluated to allow for economic development of embankment materials. Because ground water was very shallow, a soil-bentonite seepage barrier wall through a foundation sand and gravel layer was selected to connect the embankment Zone 1 core to the foundation silt layer. The barrier wall was constructed using slurry trench methods. Finally, the highly pervious sand and gravel deposits in the quarry area extended away from the reservoir, beneath the adjacent creek. The seepage barrier wall beneath the dam had to be extended across the adjacent creek valley through these deposits to limit reservoir leakage. However, to allow for expedited permits, the valley cutoff wall had to include two "windows" to avoid working in the creek or in the embankment of adjacent US Highway 40. Seepage analyses were completed to verify that the partial valley cutoff wall would produce acceptable leakage rates.
机译:瓜莉拉大坝是2003年秋季完成的新型34英尺(10米)的高,划线堤坝大坝,并于2004年投入使用。大坝采用快速轨道方法设计和建造,以满足水需求金金城市。大坝位于帝国附近,CO附近的综合采石场运行。由大坝创造的离线储层将扣押约2,140英亩(2640万立方米)的供水。一些独特的网站条件呈现了有趣的岩土科挑战,必须克服成功的项目。在短距离内,场地地层显着变化,并且仔细选择了大坝对齐以利用低渗透淤泥层中的高脊。必须仔细评估现场土壤以允许堤防材料的经济发展。由于地面水非常浅,因此选择了通过基础砂和砾石层的土壤 - 膨润土渗流阻挡壁,以将路堤区域1芯连接到基础淤泥层。使用浆料沟槽方法构造阻挡壁。最后,采石场中的高度透水砂和砾石沉积物远离水库,在相邻的小溪下方。大坝下方的渗流屏障壁必须通过这些沉积物穿过相邻的小溪谷,以限制储层泄漏。然而,为了允许加急许可,山谷截止墙必须包括两个“窗户”,以避免在溪流中或在邻近美国公路40号公路的堤防中。完成渗流分析以验证部分谷截止墙是否会产生可接受的泄漏率。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号