首页> 外文会议>Society of Petroleum Engineers Annual Technical Conference and Exhibition >Laslau Mare Field, a Successful Case of Production Optimization in Brownfield Rehabilitation
【24h】

Laslau Mare Field, a Successful Case of Production Optimization in Brownfield Rehabilitation

机译:拉斯拉母马领域,棕田康复生产优化成功案例

获取原文

摘要

Romgaz, the Romanian national gas company, and Schlumberger joined forces in 2003 through a 15-year collaborative agreement for the rehabilitation of the Laslau Mare gas field. One of the main focuses of the agreement is the acquisition of data in order to develop a deeper understanding of the field, and thereby optimize the field management plan. After a First Work Program campaign, executed in 2004—2005, field production was increased by 40%; the result of workover jobs performed and elimination of surface network bottlenecks. In addition to a portfolio of rig workovers, the approved Work Program for 2009 included an aggressive and challenging campaign of rigless interventions to optimize and maintain field production. The total production from the field has increased by 17% as a result of this rigless campaign, which mainly comprises coiled tubing interventions for water unloading (identified by slick line fluid level measurements) and the verification of the mechanical status of all active wells in the field. An additional 6% production increment was achieved with optimization of well soaping schedules, which is the current continuous water lifting method in Laslau Mare field. The encouraging results of the rigless campaign and the additionally achieved incremental production rate were realized by implementation of the production optimization workflow outlined in this paper. This workflow aims at close monitoring of individual wells, identification of production gaps and intervention opportunities. Finally, well candidates are selected based on economic analysis. The success of the campaign is demonstrated by the production gains and the short payout times achieved. The entire rigless intervention program paid out in a couple of months. This paper presents the optimization workflow, its implementation to select candidates for the rigless campaign and the production and economic results of the executed work in 2009.
机译:Romgaz,罗马尼亚国家天然气公司和斯伦贝谢在2003年加入了武士康复康复康复的15年的合作协议。协议的主要重点之一是收购数据,以便更深入地了解该领域,从而优化现场管理计划。在2004 - 2005年执行的第一个工作计划活动之后,现场产量增加了40%;工作台作业的结果执行和消除了表面网络瓶颈。除了钻机营业组合外,2009年批准的工作计划还包括一个积极和具有挑战性的严格的严格干预措施,以优化和维持现场生产。由于这种严格的运动,该领域的总产量增加了17%,这主要包括用于水卸载的线圈干预(通过光滑线流体水平测量识别),并验证所有活跃孔的机械状态场地。通过优化良好的皂化时间表实现了额外的6%的生产增量,这是拉斯鲁母马野原领域的目前连续水提升方法。通过实施本文概述的生产优化工作流程,实现了无条件运动的令人鼓舞的竞争结果和另外实现的增量生产率。此工作流程旨在密切监控个体井,识别生产差距和干预机会。最后,基于经济分析选择了良好的候选人。该活动的成功由生产收益证明,实现的短支出时间。整个严格的干预计划在几个月内支付。本文介绍了优化工作流程,其实施,为2009年执行的严格运动的候选人以及执行工作的生产和经济结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号