【24h】

RECLAIMING A GOLD MINE

机译:回收金矿

获取原文
获取外文期刊封面目录资料

摘要

An open-pit gold mine in the Mother-Lode mining region of the Sierras was essentially closed according to an accepted mine closure plan. However, because one element of the plan was not completed, due to technical disagreements, the entire mine site is now being re-examined, conceptually resulting, in revisions to the closure plans for the entire site. Elements of the mine include open-pits, a pit lake, waste rock piles, tailings pile, and a site wide surface water drainage system. Concerns to be re-addressed include: off site migration of dissolved metals in groundwater, stormwater sediment transport, revised criteria for side slope gradients of waste rock piles, disposition of pit lakes, and other complex issues.
机译:塞尔拉斯母歌矿区的露天金矿基本上根据一个接受的矿山闭合计划关闭。但是,由于该计划的一个元素未完成,由于技术分歧,整个矿山现场正在重新检查,概念上导致整个网站的关闭计划的修订。矿山的元素包括开放式坑,坑湖,废岩桩,尾矿桩和站点宽表面排水系统。重新解决的担忧包括:地下水中溶解金属的场地迁移,雨水沉积物运输,修订的废岩桩的侧倾梯度标准,坑湖泊的处置等复杂问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号