首页> 外文会议>Society of Petroleum Engineers Production and Operations Symposium >A Pilot Test of Continuous Bottom Hole Pressure Monitoring for ProductionOptimization of Coalbed Methane in the Raton Basin
【24h】

A Pilot Test of Continuous Bottom Hole Pressure Monitoring for ProductionOptimization of Coalbed Methane in the Raton Basin

机译:Raton盆地煤层甲烷生产优化连续底孔压力监测的试验试验

获取原文

摘要

Pioneer Natural Resources (Pioneer) operates over 2200 Coalbed Methane (CBM) wells in the Raton Basin in Colorado. Thewells produce out of two formations: the upper Raton and the lower Vermejo Formations. Many of the wells in the basin arecompleted in only one formation, with two wells on each pad; each well is completed in one of the formations. A number ofthe wells in the basin are completed in both formations and have commingled production. Pressure drawdown is critical incoalbed methane production, particularly in wells with large commingled perforation intervals; this is accomplished bylowering the gathering pressures and lowering the annular producing gas-water interface (fluid level) of the wells down belowthe perforation intervals. Pioneer uses acoustic measurement tools to determine the fluid level in the majority of the wells.However, in some of the wells, particularly the commingled wells, the acoustic tool is unable to measure the fluid level.A different method to determine the fluid level is to measure the bottom hole pressure and calculate the fluid level using adownhole pressure gauge. To test pressure gauges in the Raton basin, three wells with large perforation intervals were chosenfor a pilot test. Pioneer also chose three companies with different components for comparison. The system was designed to bedurable and mobile; it was also designed to connect to the existing production monitoring system. The installations for thethree wells were successful, though, there were two gauge failures and several pump failures. After the failures were analyzed,and the production of the wells had stabilized with the fluid below the perforations, two of the gauges were moved to otherwells. The intermittent acoustic measurements were compared with the pressure gauge information and the two trackedclosely; this increased the confidence in the acoustic measurements when values can be obtained. Several of the goals of thepilot project were achieved, including developing the successful system as planned and obtaining reliable bottom holepressures. There were additional unexpected results from the project; the failure analysis of the pumps lead to a solution forpump problems in the field, and the results provided Pioneer with a visual training tool for the field employees. It is too earlyto determine if the gauges could be used to more efficiently manage the commingled wells in the field, but a larger dataset ofwells may improve the understanding.
机译:先驱自然资源(先锋)在科罗拉多州的Raton盆地中经营超过2200煤层(CBM)孔。韦尔斯出两种地层:上部raton和较低的vermejo形成。盆地中的许多井只有一种形成,每个垫上有两个孔;每个井都在其中一个地层完成。盆地中的一些井在两个地层都完成并混合生产。压力缩减是关键的注入甲烷生产,特别是在具有大型混合的穿孔间隔的孔中;这实现了通过电力的聚集压力和降低了井下的环形生产气体 - 水界面(流体水平)下方的穿孔间隔。先驱使用声学测量工具来确定大部分井中的液体水平。然而,在一些井中,特别是混合井,声学工具无法测量流体水平。确定流体水平的不同方法是确定流体水平测量底部孔压力并使用Sadownhole压力计计算流体水平。为了测试Rator盆地中的压力表,选择具有大穿孔间隔的三个孔。试验试验。 Pioneer还选择了三家公司有不同的组件进行比较。该系统设计为耐用和移动;它还旨在连接到现有的生产监控系统。然而,TheThee Wells的安装成功,有两个仪表故障和几个泵故障。在分析故障后,孔的生产与流体下方的流体稳定,其中两种仪表被移至其他仪表。将间歇声学测量与压力表信息和两个轨道特性进行比较;当可以获得值时,这增加了对声学测量的置信度。达到了Pilot项目的几个目标,包括按计划开发成功的系统,并获得可靠的底部传动。项目中有额外的意外结果;泵的故障分析导致该领域的解决方案,结果提供了对现场员工的可视培训工具的先驱。它太早确定了仪表是否可以用来更有效地管理场中的混合井,但是较大的数据集可以提高理解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号