首页> 外文会议>International Conference of Computational Methods in Sciences and Engineering >Modern Approaches to Constructing Maps of the Minimum Flow of the Mountain Rivers (the Case of the Tisza Rivers Basin within Ukraine)
【24h】

Modern Approaches to Constructing Maps of the Minimum Flow of the Mountain Rivers (the Case of the Tisza Rivers Basin within Ukraine)

机译:建设山区最小流量地图的现代方法(乌克兰内部Tisza Rivers盆地的情况)

获取原文

摘要

Information on the water flow, which for the entire Tisza basin is formed in particular in the Ukrainian Carpathians, is important for the regions located in the middle and lower currents. During the period of climate change and intensification of droughts, the necessity of study of dangerous hydrological phenomena. The period of minimal runoff can also be attributed to dangerous hydrological phenomena. According to the normative documents [13], the basic calculation characteristics of the minimum flow of rivers are the 30-days minimum flow for the summer-autumn and winter periods. However, the river flood type of the Tisza river basin influences the determination of continuous periods of 30-days minimum flow. Taking into account other studies , it was proposed to use the value of 7-days minimum flow for mountain rivers. As a result of the calculations a set of thematic layers and multi-layered maps of the 7-day minimum flow was obtained.
机译:有关水流的信息,为整个TISZA盆地制成,特别是在乌克兰喀尔巴阡山脉中,对位于中间电流和下电流的区域非常重要。 在气候变化期间和加剧干旱,研究危险水文现象的必要性。 最小径流的时期也可归因于危险的水文现象。 根据规范文件[13],河流最低流动流动的基本计算特征是夏季秋季和冬季期间的30天最小流量。 然而,Tisza河流域的河流洪水型影响了30天最小流量的连续时期的测定。 考虑到其他研究,建议使用山区最低流量为7天的价值。 作为计算结果,获得了一组专题层和7天最小流量的多层地图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号