首页> 外文会议>American Society for Engineering Education Annual Conference and Exposition >Comparative Analysis between AIA and DBIA Contract Documents
【24h】

Comparative Analysis between AIA and DBIA Contract Documents

机译:AIA和DBIA合同文件的比较分析

获取原文

摘要

Integrated Project Delivery has emerged as a popular in project delivery methods in the past decade partially, because construction projects have become more complex with tight budgets and more strenuous schedules. According to the American Institute of Architects (2007), "Integrated Project Delivery (IPD) is a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction" (p. 2). IPD integrates project teams in order to take full advantage of the knowledge of all the project's key stakeholders. In response to this trend the American Institute of Architects (AIA) released a new set of transitional documents in 2008 including A195, B195, and A295, which are geared towards integrated design and construction. Particularly, AIA Document A295, General Conditions of the Contract for Integrated Project Delivery outlines the roles of the Owner, Architect, and Contractor with a number of similarities to the Design-Build Institute of America's (DBIA) Document No. 535, Standard Form of General Conditions of Contract Between Owner and Design-Builder. While there is very limited information available on whether or not any projects have been completed using one of AIA's new transitional documents, they have stirred up numerous questions among professionals in the industry in regards to they compare to DBIA, which is widely used set of documents. Thus, the objective of this paper is to compare AIA document 295 and DBIA document 535 to highlight the similarities and differences between the two documents. One of the main findings was that the AIA document is more prescriptive compare with the DBIA document, which is more flexible. This comparison contributes to the body of knowledge by allowing owners to make educated decisions regarding which document to use for their Design-Build projects. In addition, faculty and students will benefit by increasing their understanding about the content of both contract documents. Upon graduation, engineering and construction management students will enter the industry where they will most likely work on this type of projects.
机译:综合项目交付已成为过去十年的项目交付方法中的流行,因为建设项目具有更加复杂的预算和更艰苦的时间表。据美国建筑师协会(2007年)介绍,“综合项目交付(IPD)是一个项目交付方法,将人员,系统,业务结构和实践集成到一个协作利用所有参与者的人才和见解来优化项目结果的过程中,将价值增加到所有者,减少浪费,并通过所有设计,制造和施工的所有阶段最大化效率“(第2页)。 IPD集成了项目团队,以充分利用所有项目的主要利益相关者的知识。为了回应这一趋势,美国建筑师协会(AIA)于2008年发布了一套新的过渡文件,包括A195,B195和A295,该文件旨在朝向集成的设计和建筑。特别是AIA文件A295,综合项目交付合同的一般条件概述了所有者,建筑​​师和承包商与众多与设计建设研究所(DBIA)文件编号535,标准形式的相似性的作用所有者和设计建设者之间合同的一般条件。虽然使用AIA的新过渡文件中的一个项目是否已经完成了任何项目的信息非常有限,但他们在与DBIA相比,他们在行业的专业人士中激起了许多问题,这是广泛使用的文件。因此,本文的目的是将AIA文档295和DBIA文档535突出显示了两份文件之间的相似性和差异。其中一个主要研究结果是,与DBIA文件更加灵活地,AIA文件更加规范。这一比较通过允许所有者对其设计 - 构建项目进行教育决策做出教育决定,这比较有助于知识体系。此外,教师和学生将通过提高对两份合同文件的内容的理解来获益。毕业后,工程和施工管理学生将进入行业,在那里他们最有可能在这种类型的项目上工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号