首页> 外文会议>International Conference of Computational Methods in Sciences and Engineering 2005 >A Generic Design of Ladder Algorithm for Automation of Backwash Water Treatment Plant
【24h】

A Generic Design of Ladder Algorithm for Automation of Backwash Water Treatment Plant

机译:反洗水处理厂自动化梯形算法的通用设计

获取原文

摘要

This paper is about development of PLC software for control and automation of a water treatment system which is called "Backwash Water Treatment Process". The algorithm developed in this paper may be used to develop PLC based software for any control process. Developed Software is based on the filter backwash sequence which determines the time to backwash and the time to stop backwashing the filter and the quantity of Aluminum sulfate AI_2 (SO_4)_3 to be added. The decision is based on data acquired from limit switches, level switches/sensors, counters and timers. The logic sequence is designed to minimize production down time when a unit was off line due to backwashing and ensured that the primary sludge tank had sufficient capacity to accept the dirty backwash water. The algorithm is developed by considering filter backwash sequence, the I/O table developed for all input and output devices obtained by assigning the corresponding INPUT and OUTPUT number to these devices considering the particular programmable controller, developed timing diagram showing the length of occurrence of process (I/O) signals, flow chart developed for the control process and using CX-Programmer software supporting predominant ladder programming language for CQM1 PLC used as Master PLC and CPM2A-60 CDR PLCs used as slave PLCs for control of a water treatment system "backwash water treatment process. CQM1 is meant for advanced control system operations requiring 16 to 192 I/O points per PLC. CX-Simulator software was used for simulating software developed by CX-Programmer.
机译:本文涉及用于控制和自动化水处理系统的PLC软件的发展,该系统被称为“反洗水处理过程”。本文开发的算法可用于开发基于PLC的软件,用于任何控制过程。开发的软件基于滤波器反冲洗序列,该滤波器序列决定了反冲洗的时间和停止滤波器的时间和待添加硫酸铝AI_2(SO_4)_3的时间。该决定基于从限制开关,级别开关/传感器,计数器和定时器获取的数据。逻辑序列旨在最大限度地减少由于反洗并且确保初级污泥箱具有足够容量接受脏反冲水的能力时,将生产停机时间最小化。通过考虑过滤器反冲洗序列,为所有输入和输出设备开发的I / O表而开发了该算法,通过将相应的输入和输出编号分配给这些设备来实现的,考虑到特定的可编程控制器,开发了显示过程的发生长度的时序图(I / O)信号,为控制过程开发的流程图,并使用CX-Programmer软件支持用于CQM1 PLC的主要梯形图编程语言,用于CQM1 PLC,用作用于控制水处理系统的从PLC和CPM2A-60 CDR PLC。反洗水处理过程。CQM1是针对每个PLC的前进控制系统操作的先进控制系统操作。CX-Simulator软件用于CX-Programmer开发的模拟软件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号