首页> 外文会议>International Petroleum Technology Conference >Long Column Cementing of Light Slim Hole Wells, Mahakam Delta, Indonesia Case History
【24h】

Long Column Cementing of Light Slim Hole Wells, Mahakam Delta, Indonesia Case History

机译:长苗条孔井井,Mahakam Delta,印度尼西亚案例历史的长柱固井

获取原文

摘要

Gas fields in the Mahakam Delta are the most prolific in Indonesia. TOTAL E&P Indonesia operates Tunu, Tambora, Handil, Peciko, Bekapai and Sisi Nubi fields. To meet the increased production requirements while enhancing economic development, the operator is reducing drilling costs as much as possible. Slim hole well is the optimal gas well configuration being applied in Tunu and Tambora fields. The slim hole design diminishes the size and number of casing strings to produce the low pressure gas reserves economically. The latest well design, known as the light slim hole well, reduces the number of casing strings from previously four, to become three strings: conductor, surface, and production tubingless. In light slim hole well, the 24-in. conductor casing is hammered to 130 m depth, similar to the previous design. The 9 5/8-in. surface casing is set at 1,300 m TVD. The well then is completed with 4 1/2-in. production tubing, which is set at around 4,000 m TVD. Like all gas wells, light slimhole requires adequate zonal isolation along the production section. Cement sheath failure will result in sustained casing pressure and, in the worst case, loss of the well. A long open hole section has to be cemented from bottom across the production zones to 300 m above surface casing shoe. Placing a nearly 3,000 meters column of cement slurry along production casing is therefore one of the most challenging operations done on the well. The long cement column translates into large temperature differences between the bottom hole and the top of cement and high circulating pressure during slurry placement. In this case, the temperature difference can reach 90 degC [162 degF]. Design and selection of the cement slurry requires specific and tailored approach to ensure the cement sets uniformly along the long column, ensuring proper zonal isolation. By using advance software resources, the temperature of the cement particle is analyzed precisely during the cement placement. This paper outlines cement design approach for this long section hole, describes the overall cementing process, and shows field results of light slim hole wells in the Mahakam Delta.
机译:Mahakam Delta中的气田是印度尼西亚中最多产的。 E&P Total Indonesia经营隧道,坦博拉,HINEIL,PECIKO,BEKAPAI和SISI NUBI领域。为了满足增强经济发展的生产要求,运营商尽可能地降低钻井成本。纤细孔井是在隧道和坦博拉领域应用的最佳气体井配置。 SLIM孔设计减少了套管弦的尺寸和数量,以经济地生产低压气体储备。最新的井设计,被称为轻薄孔井,从前四次降低了套管串的数量,成为三个弦:导体,表面和生产管。在轻薄的洞,24英寸。导体套管撞到130米深度,类似于以前的设计。 9 5/8英寸。表面套管设定为1,300米TVD。然后用4 1/2英寸完成。生产管道,设定为约4,000米的TVD。与所有气体井一样,轻质石窟需要沿着生产截面充分的区域隔离。水泥护套失效将导致持续的套管压力,并且在最坏的情况下,井的损失。长开孔部分必须从生产区底部粘合到表面套管上方300米。因此,沿着生产套管放置近3000米的水泥浆,因此是在井上完成的最具挑战性的操作之一。长水泥柱转化为底部孔和水泥顶部之间的大的温度差和浆料放置期间的高循环压力。在这种情况下,温差可以达到90℃[162 degf]。水泥浆料的设计和选择需要具体和定制的方法,以确保水泥沿着长柱均匀地设置,确保适当的区间隔离。通过使用先进的软件资源,在水泥放置期间精确地分析水泥颗粒的温度。本文概述了这种长截面孔的水泥设计方法,描述了整体胶结过程,并显示了Mahakam Delta中轻薄孔井的现场结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号