首页> 外文会议>International Petroleum Technology Conference >Open Hole Multistage Completion Exceeds Production Expectations from South Sulige Gas Field in China
【24h】

Open Hole Multistage Completion Exceeds Production Expectations from South Sulige Gas Field in China

机译:开放孔多级完成超出了中国南苏里格气田的生产预期

获取原文

摘要

A joint venture project in the South Sulige gas field began in 2011 with the intent of evaluating horizontal drilling and open hole multistage fracture stimulation. The South Sulige gas field has two main producing formations, both with low permeability and porosity. Like many other tight gas sandstone formations in China, fracturing is necessary in order to get economic production in pad-drilling. To date, five wells have been stimulated with openhole multistage fracturing systems in the South Sulige field. Post-frac initial well performances are outstanding and have greatly exceeded expectations. This significant increase in production mirrors what has been accomplished using open hole multistage systems in North American unconventional reservoirs. The use of open hole multistage completions allows the operator to customize the treatment of specific zones by isolating targeted sections with open hole packers while also allowing better production by focusing on natural fractures in the formation. By eliminating the need to run in hole casing, cementing, and perforating, completion time is greatly reduced. It can further improve operational efficiency by enabling a continuous pumping operation, and allowing for flow back immediately after the fracturing treatment to minimize induced formation damage. This paper will discuss the overall enhanced performance achieved with staging methodology and open hole completions. The discussion will mainly focus on pre-installation wellbore preparation and operation of open hole multistage completion systems, clean-up procedures, mitigation of damage of the formation and taking advantage of natural fractures that are abundant in the South Sulige field. Open hole multi stage completions have applications in other tight formations in China where drilling and stimulation equipment availability is limited, to optimize the treatment efficiency and efficiency on the surface while maximizing production.
机译:在苏里格南天然气田合资项目于2011年开始与意图评估水平井钻井和裸眼多级压裂的。南苏丽格气田有两个主要的生产形成,既具有低渗透性和孔隙率。像中国其他许多致密气砂岩地层,压裂是必要的,以获得经济产量垫钻。迄今为止,已有五个井已用刺激在苏里格南场裸眼井多段压裂系统。后压裂井初期表现非常优秀,都大大超出了预期。在生产镜子这显著增加什么已经在北美非常规油藏使用裸眼多级系统来完成。采用裸眼完井多级的允许运营商通过与裸眼封隔器隔离针对性的部分,同时也允许更好的生产通过着眼于形成自然骨折定制特定区域的处理。由于无需在壳体孔运行,固井和射孔,完成时间大大减少。它可以通过使连续的抽吸操作,并允许立即流回压裂处理后,以尽量减少诱导的地层损害进一步提高操作效率。本文将讨论与分期方法和裸眼完井实现整体增强的性能。讨论将主要集中在预安装井筒准备和裸眼多级完井系统,清理程序,形成减轻损害的操作,并采取天然裂缝是在苏里格南领域丰富的优势。开放孔的多阶段完井具有在中国其他致密地层,其中钻井和刺激设备的可用性是有限的应用中,为了优化治疗效率和效率的表面上,同时最大化生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号