首页>
外文会议>International Petroleum Technology Conference
>Unconventionals Meets Deepwater;Lower Completion Limited Entry Liner with Retrievable Ball Drop Diversion System Applied in a Deepwater Brazil Carbonate Field
【24h】
Unconventionals Meets Deepwater;Lower Completion Limited Entry Liner with Retrievable Ball Drop Diversion System Applied in a Deepwater Brazil Carbonate Field
In order to economically develop the Albian Carbonate Macae formation in the Campos Basin Deepwater Brazil an extended reach horizontal well is required.Due to the tight nature(low permeability)of the rock, stimulation of the reservoir is required.Completion designs and techniques for treating extended reach horizontal wells in deepwater are limited.Most applications for these type wells in Deepwater are ineffective(high skin/low PI)and inefficient(trip/time intensive)affecting project economics.A com- pletion system was developed that allows for safe,effective and efficient stimulation and installation of such an extended reach horizontal well in Deepwater. This paper will describe the design,testing and execution of a unique Deepwater completion system that adapts a known multi-stage ball drop system used in onshore unconventional reservoirs,for example the US and Canada,to a known horizontal open hole sand control system to effectively matrix acidize a 2000 m horizontal open hole thru a Limited Entry Liner with reservoir segmentation.The system uses a Retrievable Ball Drop Diversion System(RBDDS)consisting of multi-stage frac sleeves run on wash pipe.The RBDDS is run inside a limited entry liner that is segmented into stages or intervals by openhole programmable interventionless packers(Mendes et al.2014)all run in a single trip and with no pipe manipulation required while stimulating.It furthermore leaves behind a robust lower completion system for the life of the field. This 2000 m lower completion system was successfully run in the Albian Carbonate reservoir and all stages treated with 15%HCl with minimal NPT,no harm to people or environment.At the time of completion,this well was the longest horizontal reservoir section and longest step out well drilled and completed in Brazil.This Limited Entry Liner System together with the RBDDS proved to be a very efficient,effective and deepwater friendly system.
展开▼