首页> 外文会议>International Petroleum Technology Conference >Drilling and Completion Technology Solutions for Challenging North Field Operations
【24h】

Drilling and Completion Technology Solutions for Challenging North Field Operations

机译:富有挑战性北方实地运营的钻井和完成技术解决方案

获取原文

摘要

From the start of the current phase of North Field drilling activity in 2002, RasGas Company Limited (RasGas) has continued to push the envelope in terms of both technology and operating practices in drilling and completions. Following the successful introduction of an Optimized Big Bore (OBB) well design in 2002~(1,2,3), advancements have been made in areas of drillstring design, drilling optimization techniques, management of lost circulation events and overpressured water flows, and stimulation technology associated with increasingly longer completion intervals. This paper highlights how these advancements have enabled year-on-year improvement in drilling and completion cycle times, even though well complexity has increased over the same time period.
机译:从2002年北野钻井活动的当前阶段开始,Rasgas Company Limited(Rasgas)继续推动钻井和完井中的技术和经营实践的信封。在2002年成功引入优化的大孔(OBB)井设计之后,在钻机设计,钻井优化技术,丢失的循环事件和过度水流的管理方面取得了进步,以及刺激技术与越来越长的完成间隔相关。本文重点介绍了这些进步如何在钻井和完井周期内实现同期的改进,尽管在同一时间段内增加了很好的复杂性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号