首页> 外文会议>International Laterite Nickel Symposium >BEATING USD10 PER POUND OF INSTALLED CAPACITY FOR A LATERITE NICKEL PLANT
【24h】

BEATING USD10 PER POUND OF INSTALLED CAPACITY FOR A LATERITE NICKEL PLANT

机译:每磅装机容量为3美元的镍厂

获取原文

摘要

To beat capital costs of USD10 per pound of installed capacity has appeared as a major hurdle for the "third" generation laterite nickel plants. Forecast costs are escalating. Where can savings come from? Ore beneficiation can reduce the tonnage rate to be processed. High pressure acid leach options include the use of indirect slurry heating and higher operating temperatures to reduce flow rates and residence time. Progress has been reported in atmospheric leaching. High counter current decantation circuit settling rates and high underflow densities reduce CCD costs. Metal recovery options include direct from leach solution to metal production, as used by Bulong and espoused by Goro, and indirect recovery as used by Moa Bay, Murrin Murrin and Cawse. Plant location impacts on the costs of tailings disposal, power and energy costs, supply of consumables and labour costs, among others. Final nickel and cobalt metal production routes are electrowinning, hydrogen reduction or some innovative routes being proposed for Goro. This paper reviews the status in these developments, with particular reference to equipment and processes that offer lower capital costs.
机译:为了击败每磅装机容量的资本成本,已经出现为“第三”代后卫镍厂的主要障碍。预测成本升级。可以节省的地方来自哪里?矿石受益可减少要加工的吨位率。高压酸浸出选项包括使用间接浆料加热和更高的工作温度,以降低流速和停留时间。在大气浸出中报告了进展。高电流倾析电路稳定率和高底层密度降低了CCD成本。金属恢复选择包括直接从浸出液体生产中的金属生产,如储物所使用的,由Goro,以及MoA Bay,Murrin Murrin和Cawse使用的间接恢复。植物位置对尾矿处理,电力和能源成本的成本影响,消耗品供应和劳动力成本等。最终镍和钴金属生产路线是电融合的,氢气还原或为Goro提出的一些创新途径。本文审查了这些发展中的地位,特别参考了提供较低资本成本的设备和流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号