【24h】

Methodology and Benefits of a Drilling Analysis Paradigm

机译:钻探分析范式的方法和益处

获取原文

摘要

This paper discusses a segment of drilling engineering -- drilling analysis -- that is assumed to be practiced routinely, but in many cases is not given the necessary attention, time, and resources required. Routinely acquired drilling, geologic, mud-log, and logging data, are shown to be amenable to organization into a knowledge-based structure that permits: ? Use of statistical analysis to develop challenging but achievable technical limits, or best composite time (BCT), for similar wells – location, depth, hole size. ? Statistics-based best composite cost (BCC), the dollars equivalent of BCT. Both the BCC and BCT represent practical, challenging but achievable benchmarks that are continuously upgraded, providing significant steps in the process of drilling costs reduction. ? Specialized learning-curve analysis, trouble-time analysis, flat-time analysis, time vs. depth analysis, cost vs. depth analysis, rig and crew performance evaluation, bit-onbottom and tripping analysis, time distribution plots, etc. ? Convenient drilling data cross-correlation with wireline logs, geology and mud-log data, to further delineate drilling problem zones and improve drilling ? operational performance. ? A historical understanding of well construction that can contribute to continuing drilling improvement, and a method to provide feedback and collaboration with company drilling personnel, rig contractors, and service companies. This paper reviews existing variations, key elements, and typical field applications of drilling analysis, and puts forth the case that drilling analysis should become an integral part of drilling engineering, the same way well-test analysis is an integral part of reservoir engineering. The need for auniversity curriculum and training on this key discipline is stressed, along with the necessity for management to champion the use of drilling analysis as an on-going process to improve organizational drilling performance.
机译:本文讨论了钻井工程钻探分析的一段 - 假设通常练习,但在许多情况下,不需要需要的需要,时间和资源。日常采集钻井,地质,泥日志和记录数据,被证明是服从组织成一个以知识为基础的架构,允许:?统计分析的应用开发挑战,但实现的技术限制,或最佳复合时间(BCT),类似的井 - 位置,深度,孔的大小。还是基于统计的最佳综合成本(BCC)时,相当于美元的BCT。 BCC和BCT都代表了实用的,具有挑战性的,但可实现的基准,这些基准是不断升级的,在减少钻井成本过程中提供了重大步骤。还是专业的学习曲线分析,故障时间分析,平时间分析,时间与深入分析,成本与深入分析,钻机和机组人员绩效评估,位onbottom和跳闸分析,时间分布图,等等?方便的钻探数据与电缆测井,地质和泥浆测井数据交叉相关,进一步描绘钻探问题区和提高钻井?操作性能。还是精心施工,可以有助于持续改善钻探和方法的历史认识,以提供公司钻井人员,钻机承包商和服务公司的反馈和协作。本文回顾了现有的变化,关键要素,并钻探分析的典型领域的应用,并提出了钻井分析应该成为钻井工程的一个组成部分的情况下,以同样的方式试井分析是油藏工程的一个组成部分。需要auniversity课程和培训这个重点学科强调,有必要对管理层来说,冠军使用钻孔的分析,成为沿着持续的过程,以提高组织的钻井性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号