首页> 外文会议>IWA International Conference on Wastewater Sludge as a Resource >The influence of operating experiences in the design of the IVAR thermal drying plant expansion in Stavanger, Norway
【24h】

The influence of operating experiences in the design of the IVAR thermal drying plant expansion in Stavanger, Norway

机译:在挪威斯塔万格的IVAR热干燥厂膨胀设计中的影响

获取原文

摘要

The Regional Wastewater Treatment Plant of North Jaeren (IVAR IKS) serves the Stavanger conurbation with a population equivalence of 240,000. The site was the first in Norway to operate a thermal drying and a pelletising plant for municipal sludge. Since the start up in 1992, IVAR has encountered most of the operational problems typically associated with thermal drying processes. Considerable modifications have been made and lessons learnt resulting in the plant being one of the few thermal drying facilities in Norway which continues to operate successfully. In general, thermal drying is often considered as a costly, energy demanding and complex process requiring careful attention to safety aspects such as risks of self-combustion, fires and dust explosions. The paper presents general considerations of operating experiences influencing the procurement and design stage of the new extended IVAR thermal drying plant. Furthermore, topical issues important for resolution of thermal drying problems are also discussed. Mass and energy balances for the Stavanger plant are presented.
机译:北方Jaeren(IVAR IKS)的区域废水处理厂为斯塔万格传动提供了240,000人的人口当量。该网站是挪威首批操作热干燥和用于市政污泥的造粒厂。自1992年开始以来,Ivar遇到了通常与热干燥过程相关的大部分操作问题。已经进行了相当大的修改,并在植物中获得的经验教训是挪威的少数热干设施之一,继续成功运行。通常,热干燥通常被认为是昂贵的,能源要求和复杂的过程,需要仔细关注安全方面,例如自燃烧,火灾和粉尘爆炸的风险。本文介绍了影响新延长IVAR热干燥厂采购和设计阶段的运营经验的一般考虑因素。此外,还讨论了对解决热干燥问题的局部问题。提出了Stavanger植物的质量和能量余额。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号