首页> 外文会议>North American Tunneling Conference >Boring a Tunnel Under a Train Station Using Ground Freezing-Line 14-T03-Extension of a Subway Line in Paris (France)
【24h】

Boring a Tunnel Under a Train Station Using Ground Freezing-Line 14-T03-Extension of a Subway Line in Paris (France)

机译:使用地面冻结线14-T03 - 在巴黎地铁线(法国)的地铁线延伸,在火车站下弄乱隧道

获取原文

摘要

A mixed brine-nitrogen artificial ground freezing method was used for the extension of Paris Metro Line 14. The project consisted in the excavation of a 26 m-long rectangular tunnel, carried out from two vertical shafts, with 122 freezing pipes. The tunnel intercepts three piles carrying an active commuter train station. The hydro-geotechnical context required the use of ground freezing as temporary support. The tunnel was divided in 6 sections, supported by heavy steel ribs and fiber shotcrete. During the works, several developments, such as the lifting of the station, water flows in the open frozen body shape and the thermal exchanges with the outside, added another level of complexity to the ground freezing handling.
机译:使用混合 盐水 - 氮 人工 冻结法 对 巴黎地铁 14 的延长线 的 项目 在 一个26 米长的 矩形隧道 开挖 包括 , 从 两个垂直 轴 进行, 122个 冷冻 管道。 隧道 截取 三个桩 承载 活性 通勤列车 站 。 加氢 岩土工程 方面 需要 冻结 作为 临时支撑 用 的 地面 。 该隧道 在 6个部分 被划分 , 通过 重钢 肋和 纤维喷射混凝土 支撑。 在 作品中, 一些发展 , 如 站 的解除, 水 在打开 冷冻 体形和 与外界 的热 交换 流动, 增加了复杂性 的 另一个层面 到地面 冻结 处理 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号