首页> 外文会议>North American Tunneling Conference >Rock Mass Characterization and Initial Support Performance of the Caldecott Tunnel Fourth Bore, San Francisco Bay Area, California
【24h】

Rock Mass Characterization and Initial Support Performance of the Caldecott Tunnel Fourth Bore, San Francisco Bay Area, California

机译:Caldecott隧道第四孔,加利福尼亚州旧金山湾区第四孔岩体征集及初始支持性能

获取原文

摘要

The Caldecott Tunnel Fourth Bore was mined using Sequential Excavation Method (SEM) tunneling. Rock mass characterization was based on observations made during excavation and initial support performance was determined through daily surveying of monitoring points. Rock mass conditions observed during excavation were often better than anticipated by the GBR and the design, and often led to classifications at least one Ground Class better than anticipated in the design distribution. This paper provides a summary of the rock mass characterization as encountered during excavation as well as comparison of the performance of the rock mass and initial support systems relative to that anticipated by the design.
机译:使用顺序挖掘方法(SEM)隧道开采Caldecott隧道第四孔。岩体表征基于在挖掘过程中进行的观察结果,通过对监测点的日常测量确定初始支持性能。在挖掘过程中观察到的岩石质量条件通常比GBR和设计预期更好,并且通常导致至少一个基础比设计分布更好的地面类。本文提供了在挖掘过程中遇到的岩体质量表征的概述,以及相对于设计预期的岩体质量和初始支持系统的性能的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号