首页> 外文会议>North American Tunneling Conference >Making the Tap: A New Deep Water Intake for the City of Austin's Water Treatment Plant No. 4
【24h】

Making the Tap: A New Deep Water Intake for the City of Austin's Water Treatment Plant No. 4

机译:制作龙头:奥斯汀市水处理厂的新水进水口4号

获取原文

摘要

The City of Austin's Water Treatment Plant No. 4 (WTP4) is one of the few large scale deep water intakes in the nation. The tap into the lake was completed in 120 feet of water with a 12.5 diameter intake shaft 85 feet deep and a fabricated steel riser pipe, which was subsequently connected to a 9 foot diameter tunnel. Prior to completing the tap, a series of probing and pressure grouting operations were performed inside the tunnel. This tap was recently completed as planned and this paper will present a case history of this challenging and very successful project.
机译:奥斯汀市水处理厂的第4号(WTP4)是全国少数大型深水摄入量之一。湖泊进入湖中的120英尺的水线完成,12.5直径进气轴85英尺深,钢立管管道,随后连接到9英尺直径的隧道。在完成水龙头之前,在隧道内进行了一系列探测和压力灌浆操作。此时最近按计划完成,本文展示了这一具有挑战性和非常成功的项目的案例历史。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号