首页> 外文会议>North American Tunneling Conference >3D Analysis of Precast Segmental Liner and Induced Settlement for EPB Excavation
【24h】

3D Analysis of Precast Segmental Liner and Induced Settlement for EPB Excavation

机译:预制节段衬垫的3D分析,EPB挖掘诱导结算

获取原文

摘要

The Anacostia River Tunnel with a length of 12,300 feet (2.33 miles) and internal diameter of 23 feet will be excavated using an Earth Pressure Balance Tunnel Boring Machine (EPBM) in the hard/stiff clays and silts/sands of the Potomac Formation. This paper presents the design of the one-pass precast steel fiber reinforced segmental liner and the analysis conducted to predict surface settlement due to the tunnel excavation. The liner was designed using closed-form solutions, as well as 2D and 3D finite element analyses. The tunnel was analyzed using Plaxis 3D to simulate the excavation, the segmental liner, the annular grout pressure, EPBM earth pressure, and the thrust of EPBM jacks.
机译:在硬/僵硬的粘土和波托马克地层的淤泥/砂岩中,将挖掘长度为12,300英尺(2.33英里)和23英尺的内径23英尺的内径23英尺的隧道。本文介绍了单通预制钢纤维增强节段衬里的设计,并进行了分析,以预测由于隧道挖掘引起的表面沉降。衬里是使用闭合液的解决方案设计的,以及2D和3D有限元分析。使用PLAXIS 3D分析隧道以模拟挖掘,节段衬里,环形灌浆压力,ePBM接地压力和EPBM千斤顶的推力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号