首页> 外文会议>North American Tunneling Conference >Constant Demand on Very Large Tunnel Boring Machine Diameters for the Construction of Today's Infrastructure Systems
【24h】

Constant Demand on Very Large Tunnel Boring Machine Diameters for the Construction of Today's Infrastructure Systems

机译:对当今基础设施系统建设的非常大的隧道镗床直径的持续需求

获取原文

摘要

The project demands of today's infrastructure systems are focused on a high level of technology and realization where mechanized tunnelling technology displays one of the solutions becoming more and more predominant today by creating conditions for environmentally friendly mobility of people and goods, by creating sustainable management of precious resources as well as the targeted development of raw materials and energy sources. This article is focused on the mechanized tunnelling of very large diameter tunnel boring machines (TBMs) for underground infrastructures. TBMs with diameters exceeding 15 meters are able to construct tunnels safe, reliable, within the given time frame and fulfilling also the demand on high quality standards. The dimensions the projects take is shown with the successful completion of projects such as the M30 highway tunnel in Madrid (EPB Shield Φ15.2m) Shanghai Changijiang Under River Tunnel Project in China (Mixshield Φ15.43m), and the Galleria Sparvo Tunnel in Italy (EPB Shield Φ15.6m). These are only a few mentioned very large diameter tunnel projects of today. The article addresses on TBMs with very large diameter which are currently in operation and design and have to deal with the complexity of geology, side constraints and tight time schedules. The complexity to fulfill highest technology standards with TBMs will be addressed which starts already in the design phase of a machine and is followed by the demand, input and involvement of all parties in the project.
机译:当今基础设施系统的项目需求集中在高层技术和实现,通过创造珍贵的可持续管理,机械化的隧道技术展示了今天变得越来越主要的解决方案,以为人和商品的环保流动性资源以及原材料和能源的目标发展。本文专注于极大直径隧道钻孔机(TBMS)的机械化隧道,用于地下基础设施。直径超过15米的TBM能够在给定的时间范围内建设隧道安全,可靠,并满足高质量标准的需求。项目采取的尺寸显示,在中国(SPB Shieldφ15.2M)在中国(MixShieldΦ15.43M)下的M30公路隧道(EPB ShieldΦ15.2M)上海长江下的M30公路隧道等项目(MIXSHIELDφ15.43M),以及意大利的Galleria Sparvo Tunnel (EPB屏蔽φ15.6m)。这些只是今天的一些额外的大直径隧道项目。本文在TBMS上解决了具有非常大直径的TBM,目前正在运行和设计,并且必须处理地质,侧限制和紧张时间表的复杂性。将解决与TBMS最高的技术标准的复杂性将被解决,该标准已经开始于机器的设计阶段,然后是项目中所有各方的需求,投入和参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号