Since the international version of the Code of Practice for Risk Management of Tunnel Works was introduced by ITIG in 2006, the use of a risk register to identify and manage project risk is increasingly becoming standard practice. The risk register has generally not been used during procurement or presented as a contract document for design-bid-build contracts. Can a risk register become a contract document in fixed price contract procurement? This paper looks around the World for guidance on how to better manage risk by transferring risk registers through procurement as a contract document. Tools such as pre-award risk negotiation, early notice of risks, and risk-related release of contingency will be assessed.
机译:由于2006年ITIG引入了隧道作品的风险管理实践守则的实践准则,因此使用风险登记册来识别和管理项目风险越来越成为标准的实践。风险登记册通常未在采购期间使用或作为设计出价合同的合同文件。风险登记册可以成为固定价格合约采购的合同文件吗?本文浏览全球,了解如何通过作为合同文件通过采购转移风险寄存器来更好地管理风险的指导。将评估诸如预授权风险谈判,早期风险通知和风险相关的应急的工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号