首页> 外文会议>Society of Petroleum Engineers International Symposium and Exhibition on Formation Damage Control >Experience With Chemical Sand Consolidation as a Remedial Sand-Control Option on the Heidrun Field
【24h】

Experience With Chemical Sand Consolidation as a Remedial Sand-Control Option on the Heidrun Field

机译:化学砂整合经验作为海德伦领域的补救砂选项

获取原文

摘要

The Heidrun field located in the Norwegian Sea is an oil and gas producing field which has been developed with a tension leg platform (TLP) installed over a template with 56 slots.Two subsea production templates and three subsea water injection templates are also tied back to the TLP.All wells require sand control measures in the reservoir section to prevent sand production.The sand control philosophy has gradually evolved from cased hole gravel packs,through stand alone screens to todays preferred option of openhole gravel packing.Sand control in the field is challenging with high fines content in the reservoir and a potential for plugging from scaling from secondary recovery with seawater.Sand control integrity has failed in some wells and offtake rates in these wells are limited to Maximum Sand Free Rates (MSFR).In some cases intervention is required for remedial sand control or new sidetracks are planned.However,for a number of suitable wells,chemical treatments that consolidate the near wellbore area can be a viable alternative to improve well offtake rates.The chemical treatment is mixed in diesel and bullheaded in the well.The active chemical will react with the connate water in the near wellbore area and form a polymerized network which binds the sand grains together.In that way,the residual strength of the formation is increased and can withstand larger hydrodynamic forces before the grains are transported into the wellbore.To date three Heidrun wells have been treated with the sand consolidating chemical that has been developed in-house.Two of these are platform wells and the third is subsea.One of the platform wells has been retreated twice following a successful first treatment.This work describes the five different treatments;the planning,the execution and the post-job analysis.One of the treatments was not successful,another one was very successful.The reasons behind these results will be discussed.
机译:所述Heidrun油田位于挪威海是已经开发了安装在带56名slots.Two海底生产模板和三个海底注水模板的模板的张力腿平台(TLP)的石油和天然气生产领域也被回接到所述TLP.All井需要在储存部,以防止砂生产。砂控制理念砂的控制措施已逐渐从套管井砾石充填的演变,通过独立的屏幕观看今天在该领域裸眼砾石packing.Sand控制的优选的选择是与容器高额罚款的内容,并从缩放堵塞从seawater.Sand控制的完整性失败的一些油井和承购在这些井率二次回收潜在的挑战仅限于最大无砂价格(MSFR)。在某些情况下干预需要补救防砂或新侧钻被planned.However,对于一些合适的孔中,化学治疗,巩固第È近井眼区域可以是一个可行的选择,以提高以及承购rates.The化学处理混合在柴油和固执在well.The活性化学品将与原生水在近井眼区域反应并形成结合所述的聚合网络沙粒together.In这样,形成的残余强度增加,能承受较大的水动力将谷物运到wellbore.To日起三个月主唱井已与已开发IN-沙巩固化学前处理这些house.Two是平台井和第三个是平台井已经两次退到成功之后第一treatment.This工作subsea.One介绍了五种不同的治疗方法,在规划,执行和作业后analysis.One的治疗并不成功,另外一个是这些成果的背后很successful.The的原因进行讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号