首页> 外文会议>Society of Petroleum Engineers international symposium and exhibition on formation damage control >Efficient Alternative to Control Sand Production in Wells with Oil/Water Contact at the Wellbore
【24h】

Efficient Alternative to Control Sand Production in Wells with Oil/Water Contact at the Wellbore

机译:有效的替代品,可以在井筒上用油/水接触用油/水接触控制砂生产

获取原文

摘要

Sand production has proved to be a severe and often costly problem in many wells in the Oriente basin of Ecuador. Sand production has a negative impact over the productivity and lifting cost when it accumulates as sand plugs in the tubing, the surface flowlines or the surface pipes or vessels, and also when eroding the stages of the electric submersible pumps, shortening their run lives. Traditional techniques used to control sand production, such as conventional screens or gravel packs have been tried by Alberta Energy Company (AEC) in Ecuador resulting in impaired productivities of up to 75%, and therefore, are considered inefficient. Other techniques are not effective because of the broad grain size distribution, and also because the production of AEC in Ecuador typically comes from moderately thin and clean reservoirs, with bottom aquifers in the well. AEC and the majority of operators in Ecuador have not yet been able to control sand production without substantially reducing the oil production. This paper presents an efficient and economic alternative to control sand production. It consists of a filter that is run in front of the perforations and that once properly packed, can virtually stop the sand without affecting the production of fluids. The completion is simple and significantly less expensive than comparable techniques. The proposed methodology has been tested so far in six AEC producers in Ecuador at flow rates up to 3000 bfpd, controlling the sand without affecting the total flow rate or the flowing pressure. A significant part of the success is attributable to a new procedure, introduced here, to naturally pack the screen. This work summarizes the experience of AEC Ecuador in techniques to effectively control the sand production and it is supported by an extensive amount of field data. The results obtained here have served to demonstrate that designs customized to fit specific reservoir conditions can help maximize the well’s productivity and to optimize the completion costs.
机译:在厄瓜多尔东方盆地的许多井中被证明是一种严重且经常昂贵的问题。当砂塞作为管道中的沙塞,表面流动线或表面管道或血管时,砂生产对生产率和提升成本产生负面影响,以及在侵蚀电动潜水泵的阶段时,缩短其运行的寿命。用于控制砂生产的传统技术,例如厄瓜多尔的Alberta Energy Company(AEC)已经尝试过常规屏幕或砾石包,导致高达75%的产品受损,因此被认为是效率。其他技术由于谷物尺寸分布广泛而且,因为厄瓜多尔的AEC的生产通常来自中等薄薄的水库,井中的底部含水层。 AEC和厄瓜多尔的大多数运营商尚未能够控制砂生产而不大幅减少石油生产。本文介绍了控制砂生产的有效和经济的替代品。它由一个过滤器组成,该过滤器在穿孔的前面运行,并且一旦适当地包装,就可以在不影响流体的生产而不影响砂的情况下停止砂。完成简单且比可比技术昂贵。拟议的方法已经在欧洲六个AEC生产商中进行了测试,该流程率高达3000 BFPD,控制着砂而不影响总流速或流动压力。成功的一部分是归因于此处介绍的新程序,以自然地包装屏幕。这项工作总结了AEC厄瓜多尔在有效控制沙子生产的技术中的经验,并且通过广泛的现场数据支持它。这里获得的结果已经证明定制以适应特定的储层条件的设计可以帮助最大化井的生产率并优化完成成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号