Improvement and uprating of hydro generator Of high dam hydro power plant in Egypt

机译:埃及高坝水电站水电发电机的改进与阐述

获取原文

摘要

Egyptian Electricity Holding Company (EEHC) produces more than 22600 MW. The hydro power plants produces 2840 MW represents about 12.5% of the total annual generating energy in Egypt. The High Dam Hydro Power Plant (HDHPP) is the biggest hydro power plant in Egypt, it consists of the 12 generation units each capacity 175 MW with a total installed capacity 2100 MW producing about 11 million kWhr/year. It has been commissioned between 1967 and 1970. The turbine are Francis type, each rated 175 MW at 100 rpm and 57.5 meters head. The discharge to generate the max. power at the design head is 343 m~3/s power generated by the turbine and controlled by 24 blade moving ring surrounding the turbine. The generators are Umbrella type, each rated 206 MVA and nominally output voltage is 15.75 kV. Many cracks appeared in the runner blades surface after one year from the first starting of the units, due to the weak of thickness at cone area and lower band caused mechanical stress of the blades. Great efforts have been exerted to clear the cracks by welding; once by the original manufacturer and second by others but the cracks transferred to the cone area also. The decision had been taken to change the runner completely. In the new runner, the design head had been increased to 62 meters instead of 57.5 M. Accordingly the capacity of the turbine is uprating to 200 MW and its efficiency increased by 5% as well as adding the new life time of the plant by 35 years. In 2003 the Instrumentation and Control (I & C) upgreaded by DCS/DAS. The achievements of such project were: 1. Increase the availability of the station to manage the load economically. 2. Better control flexibility. 3. Integration of the generators protection system and control logic. 4. Improve the liability due to redundant processor. 5. Post rip analysis. 6. Decrease forced outage of the units. In the period of 1994-1999 several investigations were conducted on the generators and the outcome of these investigations were: 1. The stator winding were found very aged, insulation strength have decreased and the rewedeing found loose in 1986. 2. The vibration of the core had increased compared with measurements in 1970, the core was found seriously buckled and the joints damaged. The deterioration of the core is extensive and might accelerate rapidly in future. 3. The rotor of some generators had sign of rim displacement, some of rotor coil conductor had cracks. 4. One pole in unit 4 turn insulation was displaced which show that the deterioration had started. The conclusion was the stator core and stator winding should be replaced. In Oct. 2003 a contract had been signed to execute such project for each 2 units (sharing one tunnel) annually within 6 years started in 2004 and end in June 2010.
机译:埃及电控股公司(EEHC)生产超过22600兆瓦。水电站生产2840兆瓦,占埃及总生成能源的约12.5%。高坝水电站(HDHPP)是埃及最大的水力发电厂,它由12代单位组成,每个容量175兆瓦,总装机容量为2100兆瓦,生产约1100万KWHR /年。它在1967年至1970年间委托。涡轮机是弗朗西斯型,每种额定值为100 rpm和57.5米的头部。放电生成最大值。设计头部的电源由涡轮机产生343 m〜3 / s功率,并由涡轮机周围的24个刀片移动环控制。发电机是伞式,每个额定206个MVA和名义上输出电压为15.75 kV。由于锥形区域的厚度弱和较低带导致刀片的机械应力,在单位的第一个开始之后,在操纵者叶片表面上出现了许多裂缝。已经施加了巨大的努力来清除焊接裂缝;一旦由原始制造商和第二个由其他制造商,而且还将裂缝转移到锥形区域。决定完全改变了赛道。在新赛道中,设计头已增加到62米,而不是57.5米。因此,涡轮机的容量升级至200兆瓦,其效率增加了5%,并将工厂的新寿命增加35年。 2003年,由DCS / DAS升级的仪器和控制(I&C)。此类项目的成就是:1。增加车站的可用性,以经济地管理负荷。 2.更好地控制灵活性。 3.集成发电机保护系统和控制逻辑。 4.提高冗余处理器引起的责任。 5.翻录后分析。 6.减少单位的强迫中断。在1994 - 1999年期间,在发电机上进行了几次调查,这些调查的结果是:1。定子绕组被发现非常老化,绝缘强度降低,1986年的重温发现松散。2.振动核心与1970年的测量相比增加了核心,发现核心严重弯曲,关节损坏。核心的恶化广泛,将来可能会迅速加速。 3.一些发电机的转子有边缘位移的迹象,一些转子线圈导体具有裂缝。 4.单位4转向绝缘的一极移位,表明劣化已经开始。结论是应更换定子芯和定子绕组。 2003年10月,每年签署一份合同,每年在2004年开始于2004年的6岁内每2个单位(共享一条隧道),并于2010年6月结束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号