BHEL experience in implementation of IEC 61850 based sub-station automation system in India

机译:BHEL在印度基于IEC 61850的子站自动化系统实施的经验

获取原文

摘要

Indian power system is growing at a rapid pace. The EHV AC transmission network which is presently integrated at National level at 400 kV is being upgraded to 765 kV. Experimental 1200 kV switchyard is being executed. HVDC stations and links are also being integrated with the ac power system. The increase in network complexities demands higher degree of automation and communication for remote control as well as power system management. Large number of Indian Utilities have adopted IEC 61850 based Substation Automation (SA) System to achieve the same. BHEL has carried out implementation of IEC 61850 based SA Systems for the various power generation and transmission utilities in India. Utilities in India have adopted the IEC 61850 technology in various ways. The paper brings out the variations in specifications and implementation methodologies adopted in the country. Starting from very basic implementations of IEC 61850 based SA Systems, the Indian utilities has evolved to increasingly more and more functionalities. BHEL being an independent system integrator, it uses products and software from multiple global vendors for SA System solutions. The variations in implementations by the different product manufacturers as well as the problems encountered in multi-vendor system integration have been discussed. The paper also deliberates integration of various standalone systems for power generation utilities like Islanding scheme, Energy metering scheme and Power Plant Distributed Control System etc. BHEL experience in IEC 61850 system implementation for HVDC project has also been discussed. Also impact of IEC 61850 based SA System implementation in the context of overall switchyard project cost has been deliberated.
机译:印度电力系统正在快速增长。 EHV AC传输网络在400 kV以400 kV升级为765 kV。实验1200 kV Switchyard正在执行。 HVDC站和链接也与AC电力系统集成。网络复杂性的增加需要更高的自动化和遥控器通信程度以及电力系统管理。大量印度公用事业采用了基于IEC 61850的变电站自动化(SA)系统来实现相同的系统。 BHEL已经执行了基于IEC 61850的SA系统,为印度各种发电和传输公用事业。印度的公用事业以各种方式通过了IEC 61850技术。本文提出了该国采用的规范和实施方法的变化。从基于IEC 61850的SA系统的非常基本实现开始,印度公用事业公司已经发展到越来越多的功能。 BHEL是一个独立的系统集成商,它使用来自多个全球供应商的产品和软件进行SA系统解决方案。已经讨论了不同产品制造商的实现的变化以及多供应商系统集成中遇到的问题。本文还审议了各种独立系统对发电实用设施,如岛屿方案,能源计量方案和发电厂分布式控制系统等IEC 61850系统实施的BHEL体验也已经讨论了HVDC项目。在整个Switchyard项目成本的背景下,基于IEC 61850的SA系统实施的影响已经审议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号