Risk Assessment Methodology for Operations applied to the Portuguese Transmission System - the Probabilistic Model

机译:适用于葡萄牙传输系统的运营风险评估方法 - 概率模型

获取原文

摘要

Nowadays most of the transmission systems' operating conditions are more stressed due to the introduction of a competitive environment in the power system industry and the regulatory changes causing the unbundling of generation, transmission and distribution, the environmental concerns, which limit the construction of new transmission lines and generation capacity, and the strong incentives to the generation through renewable energy sources. The use of methodologies that take advantage of the actual real-time conditions in combination with past knowledge is extremely interesting in the system operation's environment, because it gives a more accurate overview to the control room operators allowing them to prevent harmful situations. Obviously, this type of methodologies has received even more interest after the large disturbances which occurred in recent years, because they increase the awareness about the risk of unpredictable disturbances. Recent international data show that the frequency of large blackouts has increased and also that simple initiating faults can have very severe consequences. References [1-4] present a few examples of severe disturbances, which occurred in the recent past. Despite all the efforts being done regarding supervisory practices, operation strategies and protection and control systems' improvements, it is technically and economically impossible to eradicate major disturbances and blackouts. They will be a permanent threat to the electrical power systems, making incident analysis a crucial activity. The risk assessment methodology that is being developed is composed of two parts: probability of occurrence and severity for all contingencies under analysis. This paper aims to present the complete probabilistic model used to calculate the probability of occurrence of contingencies, including overhead lines, transformers and busbars. N-2 common cause contingencies are also considered for faults caused by lightning and forest fires.
机译:如今,大多数的传输系统的工作条件更强调由于引进在电力系统行业竞争环境及造成分拆发电,输电和配电,环境的担忧,限制了新的传输建设的监管变化的线和发电容量,并通过可再生能源的强烈的动机来产生。使用该采取与过去的知识结合实际实时条件优势的方法是在系统运行的环境非常有趣,因为它提供了更准确的概述,以控制室操作人员,让他们以防止有害的情况。显然,这种方法已经获得发生在最近几年的大扰动后更感兴趣,因为它们增加对不可预见的扰动的风险意识。近期国际的数据显示,大停电的频率有所增加,也是简单的启动故障可能有非常严重的后果。参考文献[1-4]提出了严重的干扰,这发生在最近的几个例子。尽管被做了所有的努力有关监管实践,操作策略以及保护和控制系统的改进,在技术上和经济上不可能根除大规模骚乱和停电。他们将在电力系统中的永久威胁,使得事件分析的关键活动。正在开发的风险评估方法是由两个部分组成:发生和严重程度的概率正在分析各种意外。本文旨在提出用于计算意外事件,包括架空线路,变压器和母线的发生概率的完整概率模型。 N-2常见原因突发也被认为是对由闪电引起的和森林火灾的故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号