QUALIFICATION TEST PROGRAM FOR THE 1000 MW- 500 kV HVDC VERYDEEP WATER SUBMARINE CABLE INTERCONNECTION BETWEEN SARDINIA ISLAND AND ITALIAN PENINSULA (SA.PE.I)

机译:撒丁岛岛和意大利半岛(SA.PE.I)之间的1000 MW- 500千伏HVDC SMITEDEEP水潜艇电缆互连的资格测试计划

获取原文

摘要

The SA.PE.I HVDC link consists of a bi-polar link with a rated voltage of 500 kV and a rated power of 1000 MW, which allows energy to flow in both directions between Fiume Santo (Sardinia) and Latina (Lazio, Italy Mainland). The link is based on a grid commuted twelve pulse thyristor bridge and is conceived to operate with an emergency sea return in case of outage of one cable or converter pole. At time of writing the first pole is foreseen to be completed by Year 2008, and the complete bi-pole by Year 2010. The link Owner is TERNA, the Italian Transmission System Operator (TSO) and the principal owner of the National Transmission Grid; engineering support is provided by CESI. Prysmian is in charge of Engineering, Qualification, Procurement and Construction for the whole cable interconnection and electrode system. The submarine portion is approx 425 km long and develops for about 55% in very deep waters, up to the maximum depth of 1620 m, a depth never reached before for any high-power cable interconnector. The paper describes the extensive Qualification Program carried out on the three cable designs (deep water, medium/low water and land cables) and all relevant accessories (joints, terminations, etc.), including mechanical and electrical tests according to CIGRE recommendations. Additional tests were carried out to verify all the system components under special service conditions, in particular to confirm the ability of the system to withstand repeated polarity reversals. The Qualification Program also included two complete sea trials, carried out on actual cables prototypes (for a length of more than 10 km), in deep and in medium/low water depth, as well as studies and tests for the electrodes and the relevant feeding cables.
机译:SA.PE.I HVDC链路由BI-PILL,额定电压为500 kV和1000 mW的额定功率,可以在Fiume Santo(撒丁岛)和拉塔利纳(Lazio,意大利Lazio之间的方向上流动大陆)。该链接基于网格上的十二个脉冲晶闸管桥梁,并在一个电缆或转换器杆的停电时,设想在紧急海返回操作。在撰写本文时,预计将于2008年完成,并在2010年逐年完成。链接所有者是Terna,意大利传输系统运营商(TSO)和国家传输网格的主要所有者; CESI提供工程支持。 Prysmian负责整个电缆互连和电极系统的工程,资格,采购和建设。潜艇部分长约425千米,在非常深水中开发约55%,最大深度为1620米,对于任何高功率电缆互联器之前从未到达过深度。本文介绍了三个电缆设计(深水,中/低水和陆电缆)和所有相关配件(关节,终端等)开展的广泛资格计划,包括根据CIGRE建议的机械和电气测试。进行额外的测试以验证特殊服务条件下的所有系统组件,特别是确认系统承受重复极性逆转的能力。资格化计划还包括两项完整的海洋试验,在实际电缆原型(长度超过10公里),深度和中/低水域深度,以及电极和相关喂养的研究和测试电缆。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号