Commissioning of the Italy - Sicily 420 kV submarine link: field test results

机译:意大利调试 - Sicily 420 kV潜艇链接:现场测试结果

获取原文

摘要

The paper deals with time domain simulations of a 420 kV ac submarine cable line between Italy and Sicily. The study analyses the switching transients upon link energization, switching manoeuvres and faults, under different network scenarios, in order to identify the most suitable switching sequence. Simulations have been carried out using two different electromagnetic transient programs, in order to evaluate the expected accuracy. The same portion of the Sicilian and Southern Italy EHV network has been represented in both programs; however, due to different software limitations, different cable and transformer models have been used. The results of time domain simulations obtained by the two tools show a very good agreement, so that the expected overvoltages can be considered, to a good approximation, closely matching the real behaviour of the entire system. Finally, the verification of the cable model employed with one of the software has been performed, and some remarks regarding the delayed zero cross have been reported.
机译:本文涉及意大利和西西里岛之间的420 kV潜艇电缆线的时域模拟。该研究通过在不同的网络场景下进行链路通电,切换机动和故障时,分析开关瞬变,以识别最合适的切换序列。使用两个不同的电磁瞬态程序进行了模拟,以评估预期的准确性。 Sicilian和意大利南部EHV网络的同一部分在两个方案中都代表;但是,由于不同的软件限制,已使用不同的电缆和变压器模型。通过两种工具获得的时域模拟的结果表明了非常良好的一致性,因此可以考虑预期的过电压,以良好的近似,与整个系统的真实行为密切相关。最后,已经执行了与其中一个软件采用的电缆模型的验证,并且已经报道了关于延迟零十字的一些评论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号