Belgian experience with real time thermal rating system in combination with distributed temperature sensing techniques

机译:比利时经验与实时热评定系统结合分布式温度传感技术

获取原文

摘要

The required permanent load of a HV cable system is an important parameter to select the right cross section and define the appropriate laying conditions. However the overload capabilities of a HV cable circuit are seldom used to avoid the risk to overheat the cable system and influence the lifetime of the system. With the use of a real time thermal rating (RTTR) system Elia wants to overload a strategic 150 kV link on a safe and controlled way. The first RTTR system of Elia was installed end 2014 on a 33 km long cable link 150 kV - 2000 mm~2 Alu between Koksijde and Slijkens. During the preparation and after the installation of the DTS/RTTR system several problems were tackled: communication and IT related problems, calibration problems of the DTS, adjustments of the thermal model of the RTTR,.... The key factor to success for an efficient integration in the Elia grid is the early involvement and collaboration between different experts: IT, cable and data communication. In order to improve the accuracy of the entire RTTR system several actions should be taken and planned after the installation: adjustment of the thermal zones, verification of communication paths, analysis of the calculated fibre temperature, different hot-spot analysis. This paper explains the experience of Elia with the installation of the RTTR system, focusing on typical problems and provides final recommendations about the integration and overload capability of the 150 kV link with a DTS and RTTR system.
机译:HV电缆系统的所需永久负载是选择右侧横截面并定义适当的铺设条件的重要参数。然而,HV电缆电路的过载能力很少用于避免过热电缆系统的风险并影响系统的寿命。通过使用实时热额定值(RTTR)系统,ELIA希望以安全可控方式过载战略性150 kV链路。 Elia的第一个RTTR系统于2014年以33公里的长线连杆150 kV - 2000 mm〜2 Alu安装在Koksijde和Slijkens之间。在准备期间和在安装DTS / RTTR系统之后,解决了几个问题:通信和IT相关问题,DTS的校准问题,RTTR的热模型的调整....成功的关键因素ELIA网格中的高效集成是不同专家之间的早期参与和协作:它,电缆和数据通信。为了提高整个RTTR系统的准确性,应在安装后采取多种操作:调整热区,验证通信路径,分析计算纤维温度,不同的热点分析。本文解释了ELIA在安装RTTR系统的情况下,专注于典型问题,并提供关于150 kV链路与DTS和RTTR系统的集成和过载能力的最终建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号