The power generation by wind turbines has been developed to a major part besides the classical power plants based on coal, gas and nuclear fuel. Since some years the installation of big wind farms located offshore is investigated and in implementation. The first wind farms have been connected to the transmission grids e.g. in UK. Major activities are in progress in Germany to install different wind farms in a total of several Gigawatts installed power within the next years. In France the wind farm Cote d'Albatre is in the realization process. The overall size of the wind farm is 105 MW delivered by 21 wind generators of the type AREVA Multibrid M5000. The location of the wind farm is offshore in the Normandy in France. A major part of the implementation process is the proof of the compatibility to the connection requirements defined by the transmission system owner. The requirements for the connection are defined in Grid Codes available for the different transmission system owners. Even if the general rules are similar in all Grid Codes there are a lot of details which create special requirements. The presented paper will give a summary of the investigations carried out to fulfill the given requirements by RTE, the French grid operator. This includes investigations on steady state analyses as well as transient stability calculations. Additionally small signal stability investigations have been carried out to round up the complete scope. The basic model is described in general. The requirements and the methodology to fulfill the requirements are highlighted. The results are given by some examples. Detailed data are mainly required to investigate dynamic behaviour of the wind farm in case of faultride- through situations. Here the behaviour of the individual wind turbines as well as a whole wind farm has been tested. The required investigations have been carried out successfully by a team of different partners including competing companies. The latest results are that all requirements are fulfilled and approved.
机译:除了基于煤,气体和核燃料的经典发电厂,风力涡轮机的发电已经开发为主要部分。自一些多年以来,在离岸的大型风电场的安装是在实施和实施中的。第一风电场已经连接到传输网格。在英国。德国的主要活动正在进行中,在未来几年内总共安装不同的千兆瓦的电力。在法国,风电场Cote D'Albatre正在实现过程中。风电场的整体尺寸为105兆瓦,由ISVA多纤体M5000型21型风发电机提供。风电场的位置在法国诺曼底的海上。实施过程的主要部分是对传输系统所有者定义的连接要求的兼容性证明。连接的要求在可用于不同传输系统所有者的网格代码中定义。即使常规规则在所有网格代码中都有类似的细节,也会产生特殊要求。本文将概述进行RTE,法国网格运营商履行给定要求的调查摘要。这包括对稳态分析以及瞬态稳定性计算的调查。另外,已经进行了小的信号稳定性调查,以满足完整的范围。基本模型一般描述。突出显示要求的要求和方法。结果由一些例子给出。主要需要详细数据来调查风电场的动态行为,以防父母族的情况。这里已经测试了各个风力涡轮机以及整个风电场的行为。由包括竞争公司的不同合作伙伴团队成功地进行了所需的调查。最新结果是所有要求都履行和批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号