LIFE CYCLE MANAGEMENT OF SWITCHGEAR REVIEW OF CIGRE WG 13.08'S TECHNICAL BROCHURE 165

机译:CIGRE WG 13.08技术小册子的开关综述生命周期管理165

获取原文

摘要

In CIGRE Technical Brochure 165 "Life Management of Circuit-Breakers" [1] much attention has been given to the stresses in service, to methods to assess the residual life of a population of circuit-breakers and methods to support end-of-life decisions. Today, looking back, the developments in the industry, especially the societal and managerial developments, are such that certain aspects of the studies performed in the nineties may have to be reevaluated. Examples of developments to be addressed are: utilities generally expect high voltage equipment to provide service for more than 40 years rather than 25 years: asset management has introduced risk management with parameters such as regulatory aspects, societal aspects, risk appetite, transparency of decision making, life data analysis, handling probabilities and incomplete data; the permanent change of the organisational setting of utilities and manufacturers (merges, splitting, globalisation) with its consequences on the company's focus; the financial pressure, especially related to the operational costs, and therefore the requirement to run the plant longer; the strong need for flexible solutions (in terms of short delivery and erection times, low maintenance, high availability, low operational costs, high adaptability to the environment), upwards compatibility of primary and secondary plant, as offered by new technologies, including diagnostic and monitoring techniques; the higher environmental requirements, including reduction of space and volume; lack of staff, outsourcing, changing ownerships. Within CIGRE SC A3 further studies on life cycle management and the collection of service experience is recommended.
机译:在CIGRE技术小册子165“断路器的寿命管理”[1]备受关注的关注服务中的应力,以评估一个断路器群体的残留寿命和支持寿命的方法的方法决定。今天回顾,行业的发展,尤其是社会和管理发展,这使得在九十年代中进行的某些方面可能必须重新评估。要解决的发展的例子是:公用事业公司通常预计高压设备提供40多年而不是25年的服务:资产管理已引入风险管理,参数,如监管方面,社会方面,风险偏好,决策透明度,促进恐怖性偏好,决策透明度,生活数据分析,处理概率和不完整的数据;用其对公司的重点后果公用事业和制造商(合并,拆分,全球化)的组织设置的永久变化;财政压力,特别是与运营成本有关,因此要求更长的植物的要求;强烈需求灵活的解决方案(在短暂的交付和安装时间方面,低维护,高可用性,低运营成本,对环境的高适应性),新技术提供的主要和次级工厂的向上兼容性,包括诊断和诊断监测技巧;环境要求越高,包括减少空间和体积;缺乏员工,外包,不断变化的所有权。在CIGRE SC中,建议进一步研究生命周期管理和服务经验的收集。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号