Different strategies to replace, repair, refurbish and upgrade power transformers and the Spanish experience in this field are presented, covering both high voltage transmission and generator step up applications. Those include repair and refurbishment operations on site and in manufacturing facilities, the alternative to replace windings of existing units to increase the power output and to reduce load losses, the use of standardized units, universal transformers and multi-voltage poly-transformers for contingency planning and the progressive re-powering on site of the main transformers in a nuclear power plant. When deciding the best alternative to replace, refurbish or repair a transformer, several factors need to be considered, especially the cost and time to accomplish the work, but also the kind of defect or fault, the age and type of transformer, the possible technical alternatives and the associated risks. Refurbish or retrofit a transformer provides cost advantages related to reusing existing materials. Some retrofit and repair examples are presented including change of windings with the benefit of reutilization of the core and tank. The repair of a power transformer in a manufacturing facility is a good alternative, especially when the dimensions and weight allow transportation by road, implying a quick and reasonable cost solution for shipment. Performing on site repair works is a different option with similar reliable and quality results, requiring an adequate preparation and conditioning of the environment, special equipment, processes, testing and experienced personnel. The main advantages related to on site repair works are shorter repair time and lower cost when compared to shipment to a repair location, especially for bigger size transformers. The circumstances existing in each particular case will determine the optimum alternative but an adequate contingency planning and a proper policy of spares, considering the strategic importance and risk of the transformer, simplify the decision process and help to achieve satisfactory results, minimizing the cost and time of unavailability.
机译:提出了不同的策略,修复,翻新和升级电力变压器和该领域的西班牙语体验,涵盖了高压传输和发电机升压应用。这些包括现场和制造设施的修复和翻新操作,替代现有单元的绕组增加功率输出并降低负载损耗,使用标准化单元,通用变压器和多电压多变压器的应急计划以及核电站主变压器现场的逐步重新供电。当决定更换,翻新或修理变压器时,需要考虑几个因素,尤其是完成工作的成本和时间,也是变压器的缺陷或故障,年龄和类型,可能的技术替代品和相关的风险。翻新或改造变压器提供与重用现有材料相关的成本优势。提出了一些改造和修复示例,包括绕组的绕组的变化,其具有芯和罐的再生。在制造工厂中的电力变压器的修复是一个很好的替代方案,特别是当尺寸和重量允许通过道路运输时,暗示了一种快速合理的装运成本解决方案。在现场修复工作中表演是一种不同的选择,具有相似可靠和质量的结果,需要适当的环境,特殊设备,流程,测试和经验丰富的人员进行充分的准备和调理。与现场维修工作相关的主要优点是修复时间较短,与运输到维修位​​置时的成本更低,特别是对于更大尺寸的变压器。在每个特定案件中存在的情况将确定最佳替代,但考虑到变压器的战略重要性和风险,简化了决策过程的战略重要性和风险,并有助于实现令人满意的结果,最大限度地减少成本和时间不可用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号