【24h】

Successful Placement of Openhole Plug in HT Conditions

机译:在HT条件下成功放置OpenHole插头

获取原文

摘要

This case history paper describes the use of a bottomhole kickoff assembly (BHKA) tool to place openhole plugs in a high-temperature well. The well was a 6 1/2-in. diameter borehole with 52° deviation and 174°C (345°F) bottomhole static temperature (BHST). Depth was 5775 m (18,946 ft). Even though these extreme conditions were anticipated, they were discussed with the operator because two earlier attempts to achieve a kickoff had failed. In this successful kickoff operation, the BHKA was tagged 1 m (3.3 ft) below the calculated top of cement and was tested to 6 tons over the plug, using a 165-mm (6 1/2-in.) roller cone bit. Conditions for both the tool and cement slurry were extreme. Kickoff was successfully accomplished during the first 8 m (26 ft) of the BHKA plug; formation cuttings of 99% were reported.
机译:本案例历史撰写纸张描述了使用底孔喷射组件(BHKA)工具在高温井中放置OpenHole插头。井是6 1/2英寸。直径钻孔,52°偏差和174°C(345°F)底孔静态温度(BHST)。深度为5775米(18,946英尺)。尽管预期这些极端条件,但他们与运营商讨论过,因为早些时候才能实现开球失败。在这种成功的开球操作中,使用165毫米(6 1/2英寸)滚子锥钻头,将BHKA标记为1米(3.3英尺),并在插头上测试到6吨。工具和水泥浆料的条件是极端的。在BHKA插头的前8米(26英尺)的前8米(26英尺)期间,开球成功完成;报告了99%的形成切屑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号