首页> 外文会议>Society of Petroleum Engineers Asia Pacific Oil Gas Conference and Exhibition >The West Java Rehabilitation Project: A Holistic, Integrated Approach to Consistently Conform to Safety Standards, Ensure the Readiness of the Facilities for Continuous Production
【24h】

The West Java Rehabilitation Project: A Holistic, Integrated Approach to Consistently Conform to Safety Standards, Ensure the Readiness of the Facilities for Continuous Production

机译:西爪哇康复项目:全面,综合方法一贯符合安全标准,确保持续生产设施的准备

获取原文

摘要

BP West Java (BPWJ) has operated the oil and gas fields located offshore in the northwestern part of the Java Sea since 1970. This asset consists of more than 200 offshore structures, with 11 manned flow-stations and more than 350 subsea pipelines totaling about 1,600 km that are spread across a geographic area of 350 km x 150 km. The strategic objective of BP West Java is to conduct safe and efficient operations and manage the declines by developing the remaining reserves more efficiently. In recent years, the facilities and wells have suffered progressive deterioration that has affected production and increased the potential for major accidents at the offshore facilities. An ongoing integrity management plan, in place since 2002, has served to continuously reduce risks related to integrity and deterioration issues. However, the pace and resources of this plan have not been sufficient to consistently meet all levels of safety and, as a result, the facilities are coming under increasing risks.
机译:自1970年以来,BP West Java(BPWJ)经营了爪哇西北部近海的石油和天然气田。该资产由200多个海上结构组成,11个载人流动站和超过350个海底管道总额1,600公里遍布350公里的地理区域x 150公里。 BP West Java的战略目标是通过更有效地开发剩余的储备来进行安全有效的运营,并管理下降。近年来,设施和井遭受了渐进的恶化,影响了生产,并增加了离岸设施的主要事故的潜力。自2002年以来,正在进行的诚信管理计划,已持续减少与诚信和恶化问题相关的风险。然而,该计划的步伐和资源并没有足以始终如一地满足各级安全级别,因此设施正在增加风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号