首页> 外文会议>Society of Petroleum Engineers Asia Pacific Oil Gas Conference and Exhibition >A Case History: First Real-Time Digital Flow Profiling of a Passive Inflow Control Device (ICD) Completion
【24h】

A Case History: First Real-Time Digital Flow Profiling of a Passive Inflow Control Device (ICD) Completion

机译:案例历史:无源流入控制装置(ICD)完成的第一个实时数字流程分析

获取原文

摘要

While adapting Advanced Well Completions (AWC) in horizontal wells has provided significant improvements in reservoir deliverability and depletion, it has also resulted in increased data gathering challenges for the longer and deeper completions, in particular, the options to perform well logging are reduced, and the costs are high. This is related to both the costs of the more advanced horizontal well logging tools and the more expensive logging methods, such as coiled tubing and tractor systems, used for the conveyance of these tools into the wellbore. In an effort to acquire high quality downhole data in a timely manner from passive Inflow Control Device (ICD) completions, Saudi Aramco set about investigating the alternatives to traditional production logging methods. A technology gaining greater industry acceptance in recent years, is the permanently installed Distributed Temperature Sensing (DTS) and this technology has become the focus of investigation. The limitations of single point permanent Downhole Pressure Monitoring (PDHM) and DTS technology were soon realized. In particular, the limited temperature resolution from DTS and discrete point PDHM readings, were not sufficient for evaluating horizontal wells. At the time of investigation a new generation of DTS technology became commercially available, providing a ten-fold improvement in measurement resolution. This allowed Saudi Aramco to proceed with field trials for this new technology. This paper will present the case history from the world’s first installation of DTS in a horizontal ICD completion while showing the advanced well completion design and the data from the field trials. The paper will also indicate the future of DTS in advanced well completions.
机译:在横向井中调整高级井完井(AWC),提供了储层可传递能力和耗尽的显着改善,因此还导致了增加的数据收集挑战,特别是更深层次的完井,特别是执行良好的记录的选项减少,并且成本很高。这与更先进的水平井测井工具和更昂贵的测井方法(例如盘管和拖拉机系统)的成本有关。用于将这些工具的输送到井筒中。在从无源流入控制装置(ICD)完成时,沙特阿美公司的努力以及时地获取高质量的井下数据,沙特阿美公司集中了解传统生产测井方法的替代品。近年来,一项越来越大的行业接受,是永久安装的分布式温度传感(DTS),这项技术已成为调查的重点。单点永久井下压力监测(PDHM)和DTS技术的限制很快就实现了。特别地,来自DTS和离散点PDHM读数的有限温度分辨率,不足以评估水平孔。在调查时,新一代DTS技术成为可商购,提供了测量分辨率的十倍提高。这允许沙特阿美公司继续进行这项新技术的现场试验。本文将在水平ICD完成中展示世界首次安装DTS的案例历史,同时显示了现场试验中的高级井完成设计和数据。本文还将指示高级井完井中DTS的未来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号