首页> 外文会议>Conference on Optical, Infrared, and Millimeter Space Telescopes >James Webb Space Telescope (JWST) Optical Telescope Element (OTE) development status
【24h】

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) development status

机译:James Webb Space Telescope(JWST)光学望远镜元件(OTE)开发状态

获取原文

摘要

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK), and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.
机译:James Webb Space Telescope(JWST)光学望远镜元件(OTE)是分段的低温望远镜,预定于2011年推出。2002年9月,美国宇航局选出了主要承包商诺斯罗普·格鲁姆斯空间技术(NGST),建立了包括管理的天文台OTE。 NGST与分包商球航天,Alliant TechSystems(ATK)和柯达一起团结联合。该团队在过去的一年里完成了几种重要的设计,技术,架构定义和制造里程碑,这些内容在本文中总结了。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号