首页> 美国政府科技报告 >James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status
【24h】

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

机译:詹姆斯韦伯太空望远镜(JWsT)光学望远镜元件(OTE)发展现状

获取原文

摘要

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号