首页> 外文会议>IADC/SPE Asia Pacific Drilling Technology >Using Expandable Liners in Deep High Pressure Wells : A Case Study
【24h】

Using Expandable Liners in Deep High Pressure Wells : A Case Study

机译:深层高压井中的可扩展衬里:一个案例研究

获取原文

摘要

Sabriya 72 (SA-72) is a deep vertical high pressure well originally drilled in North Kuwait in 1983 which was temporarily abandoned due to stuck pipe. The last intermediate casing was set prematurely above the base of a critical highly pressured salt section. Due to the importance of the SA-72 location to appraise a newly discovered field, economics favored re-entering this well in 2003 and sidetracking directionally to intersect suspected fractures in the Jurassic Marrat carbonate formation. The main challenges of this well were to sidetrack to the target depth without compromising well integrity, and to test the well with the largest production liner possible.
机译:Sabriya 72(SA-72)是1983年在北科威特的深度垂直的高压,于1983年钻探,由于管道暂时被遗弃。最后的中间套管过早地设定在关键高压盐部分的基础上方。由于SA-72的重要性评估了新发现的领域,经济学青睐于2003年重新进入这井,并定性地侧身以在侏罗纪碳酸盐酯形成中交叉伴随着伴随的骨折。这孔的主要挑战是侧身到目标深度而不会影响良好的完整性,并用最大的生产衬里测试井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号