Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

机译:Xstrata铜欧内斯特亨利地下项目前方研究的通风设计

获取原文

摘要

The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of approximately ten million tonnes per annum. The pit will cease mining towards the end of 2010. Extensive surface diamond drilling has confirmed an extension of the orebody to depths of 1000 m below surface. A prefeasibility study was commissioned in late 2006 to investigate underground mining options with the preferred mining method being an inclined sublevel cave. In February 2008 mining of a decline commenced in conjunction with a feasibility study to further investigate the project. Work from the prefeasibility study indicates that an underground crusher, conveyor and hoisting shaft could be utilised to crush and transport broken ore from the sublevel cave workings to the concentrator. The study suggests that a production rate of five million tonnes per annum could be achieved and sustained for up to ten years. Ventilation designs and requirements will form a large section of the feasibility study. This paper will detail investigations of preliminary ventilation network designs of the proposed sublevel cave. Work has been completed using both Ventsim and VumA ventilation simulation packages. Ventsim was used to provide preliminary estimations and suggest alternatives for: surface fan duties; airflow characteristics (direction, velocity, pressure and quantity); and ventilation network design in key mine areas. With mining activities reaching depths in excess of 1000 m below surface an analysis of heat conditions should be conducted. The VumA software package was used to model the thermal properties of the ventilation system. This model will provide a basis for the preliminary decisions on refrigeration requirements for the mine.
机译:Ernest Henry Mine是位于澳大利亚昆士兰西北部的露天铜金矿运营。它由XSTRATA铜制拥有和操作,每年具有当前集中器吞吐量约为千万吨。该坑将停止开采到2010年底。广泛的表面钻石钻探已经证实了矿体的延伸,深度为1000米的深度。在2006年底委托了一个前可行性研究,以调查地下采矿期权,优选的采矿方法是倾斜的卸级洞穴。 2008年2月,随着可行性研究,开展的矿业逐渐发展,以进一步调查该项目。从前途进行的工作表明,地下破碎机,输送机和升降轴可用于挤压和运输从Sublevel洞穴工作到集中器的破碎矿石。该研究表明,每年500万吨的生产率可以实现,持续到十年。通风设计和要求将形成一部分可行性研究。本文将详细调查建议的Sublevel Cave的初步通风网络设计。使用Ventsim和Vuma通风模拟包装完成了工作。 Ventsim用于提供初步估计,并提出以下替代品:表面粉丝税;气流特性(方向,速度,压力和数量);关键矿区通风网络设计。随着矿业活动达到超过1000米以下的深度,应进行热条件的分析。 VUMA软件包用于模拟通风系统的热特性。该模型将为矿井制冷要求提供初步决策的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号