An Experimental Study on the Preventive Schemes for WaterDamages of Fan Dry Coil Unit (FDCU) System

机译:风扇干燥线圈单元(FDCU)系统水刚度预防方案的实验研究

获取原文

摘要

As horizontal positioning at ceiling level of existing Fan Dry Coil Unit (FDCU) installation, the condensation and leakage of chilled water may take place and, thereafter, resulting a damage. Therefore, the objective of this study is to investigate and evaluate the performance of several preventative methodologies (schemes) for condensation and chilled water leakage of the FDCU system. Firstly, the original horizontal dry coils were modified to be V-type so as to contain the possible condensate or leaked chilled water. Secondly, the condensation detector and leakage detector were installed. Experimental tests were performed to evaluate the effectiveness of any condensation and the leakage of chilled water. Finally, the original positive-pressure of supply water system was changed to a negative one. A water check valve was installed on the welding point of the coil. This check valve was to simulate a leakage or a broken pipe of the coil. The situation of water-leakage was discussed. Experimental results show that the V-type dry coil can efficiently lead the condensate to the water tray. Utilized the condensation detector, surface condensation can be prevented. Negative-pressure water supply system proved to be a good option for the prevention of the leakage of chilled water.
机译:作为现有风扇干燥线圈单元(FDCU)安装的天花板水平的水平定位,可能发生冷冻水的冷凝和泄漏,然后导致损坏。因此,本研究的目的是研究和评估几种预防性方法(方案)的凝结和冷冻水漏水的性能的性能。首先,修饰原始水平干燥线圈以V型,以便包含可能的冷凝物或泄漏的冷却水。其次,安装了冷凝探测器和泄漏检测器。进行实验试验以评估任何冷凝的有效性和冷冻水的泄漏。最后,供水系统的原始正压变为负面压力。水止回阀安装在线圈的焊接点上。该止回阀是模拟线圈的泄漏或断管。讨论了水泄漏的情况。实验结果表明,V型干式线圈可以有效地将冷凝物引导到水托盘上。利用冷凝探测器,可以防止表面冷凝。负压供水系统证明是防止冷冻水泄漏的好选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号