POWER-GEN ASIA 2002, SINGAPORE, 2 to 4 OCTOBER 2002 CLIENT CONTRACTOR ALLIANCE GENERATES SAVINGS FOR POWER STATION CONTROL SYSTEM REPLACEMENT PROJECT

机译:2002年10月2日至4日,新加坡Power-Gen Asia 2002年10月2日至4日客户承包商联盟为电站控制系统更换项目提供了节省

获取原文

摘要

Large thermal plants built in the 1970s and 1980s are now being required to operate well beyond their originally envisaged twenty to thirty year plant life. As part of the plant life extension, original control systems can be replaced with modern distributed control systems, leading to operational improvements and cost savings. The traditional contracting route can lead to disputations and cost increases, because it is rarely possible to completely define the scope of work at the outset of the project. Plant changes and modifications made since the original commissioning compound these problems. Macquarie Generation owns and operates the Liddell Power Station, a major 4 × 500 MW coal-fired plant in NSW, Australia, commissioned in the early 1970s. Many major changes had been made since commissioning, including replacement of the original electrostatic precipitators and ID fans with fabric-filter dust collection equipment and associated high head ID fans. Other changes made included changes to data logging systems, fuel oil firing systems, burner management systems and many more minor changes to auxiliary equipment. As a result, plant documentation could not be guaranteed to accurately reflect the actual plant. Macquarie Generation chose a novel alliance method to implement the control system changeover, instead of the more traditional contracting route. In early 2001, following a competitive tendering process, Macquarie Generation formed an alliance with Yokogawa Australia Pty Ltd and Downer R M Lee to replace the original obsolete control equipment at Liddell Power Station. The first unit changeovers commenced in 2002. Each unit outage was restricted to nine weeks' duration. The alliance brings the customer and control system supplier together into a single team with common objectives, both technical and financial. The result has been that the control system changeover is proceeding successfully, avoiding the cost increases or disputes that have been typical for such projects. This paper describes the significant benefits and savings by undertaking a control system replacement project as an alliance between supplier and end user, instead of taking the more traditional contracting route.
机译:现在,建造在20世纪70年代和20世纪80年代的大型热植物,现在需要超越其最初设想的二十至三十年的植物生活。作为植物寿命延伸的一部分,原始控制系统可以用现代分布式控制系统代替,导致运营改进和节省成本。传统的契约路线可能导致争议和成本增加,因为很少可以完全定义项目一开始的工作范围。自原始调试复合这些问题以来的植物变化和修改。麦克里一代拥有并经营Liddell Power Station,澳大利亚新南威尔士州新南威尔士州的主要4×500 MW燃煤厂,于20世纪70年代初委托。自调试以来已经制定了许多重大变化,包括更换原始静电除尘器和具有织物过滤器除尘设备和相关的高头ID风扇的ID风扇。对数据记录系统,燃料油射击系统,燃烧系统,燃烧器管理系统的更改以及对辅助设备进行更小的更改进行了更改。因此,无法保证工厂文件准确反映实际工厂。 Macquarie Generation选择了一种新的联盟方法来实现控制系统转换,而不是更传统的契约路线。 2001年初,在竞争性招标过程之后,麦格理发电成立了与横河川澳大利亚PTY LTD的联盟和Downer R M Lee,更换了Liddell发电站的原始过时的控制设备。第一个单位转换在2002年开始。每个单位停电都受到九周的持续时间。该联盟将客户和控制系统供应商带入一个具有普遍目标的单一团队,包括技术和财务。结果一直是控制系统转换正在成功进行,避免成本增加或争议对于此类项目典型。本文介绍了控制系统更换项目作为供应商和最终用户之间的联盟,而不是采取更传统的契约路线来介绍显着的益处和节省。

著录项

  • 来源
    《Power-Gen Asia》|2002年||共1页
  • 会议地点
  • 作者

    Philip Nicholson;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TM6-53;
  • 关键词

  • 入库时间 2022-08-21 00:26:44

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号