"Oleoduto Cabiunas REDUC -OSDUC II", a new 183km 10in pipeline, started operating for TRANSPETRO, a subsidiary of PETROBRAS, in September 2002, transporting Natural Gas Liquids from Cabiunas Terminal, the on-shore facility responsible for treating all natural gas coming from Campos basin crude oil production fields, to a NGL Fractionation Plant (UFL) inside Duque de Caxias PETROBRAS refinery (REDUC), near Rio de Janeiro. Because the NGL delivered from natural gas treatment process was absolutely free of water and considering the high sulfur content in the wet gas coming to shore, the pipeline was designed to be dried with nitrogen, after construction and hydrostatic tests, regardless of pipe materials specifications, in order to prevent corrosion and hydrogen-induced cracking. Commissioning, the next step, could not be performed as a simple and single operation, because the Liquids Recovery Plant (URL), in the first of three development phases, did not have the capacity either to feed main pipeline pump with the minimum flow required to maintain continuous operation or to assure pig run to be performed within the ideal speed range to guarantee good sealing efficiency. After none of the few available alternatives proved to be suitable, there was no doubt that an innovative approach was the only way to overcome the challenges on commissioning the line under such sort of restrictions despite running risks of postponing pipeline startup in case the filling process did not succeed accordingly. Then, TRANSPETRO engineering team came up with an unusual solution where the line fill process was divided into 8 pumping-stoppage cycles along with the use of polyurethane pigs as a mechanical barrier between liquid and gas phases. This work describes all key factors from pipeline conceptual design, to commissioning procedures and implementation, as well as the tools used to forecast flow conditions and all critical events.
机译:“Oleoduto Cabiunas Reduc -OSDuc II”,这是一个新的183公里10英寸的管道,开始为Petrobras的子公司,2002年9月,从Cabiunas终端运输天然气液体,负责治疗来自的所有天然气Campos Basin原油生产领域,到NGL分馏厂(UFL)内部Duque de Caxias Petrobras炼油厂(Reduc),靠近里约热内卢附近。因为从天然气处理过程中递送的NGL绝对不含水,并且考虑到湿气体中的高硫含量来到岸上,因此管道设计用于氮气干燥,施工后和静液压试验,无论管材材料规格如何,为了防止腐蚀和氢致裂化。调试,下一步,无法作为一个简单和单一的操作进行,因为液体恢复工厂(URL),在三个开发阶段的第一个,没有容量馈送主管泵的最小流量保持连续操作或确保猪在理想的速度范围内进行,以保证良好的密封效率。除了少数可用的替代方案中没有被证明是合适的,毫无疑问,尽管在填充过程中运行了推迟管道启动的情况下,尽管在填充过程中运行了推迟流水线启动的风险,但克服了在这些限制的挑战中克服了挑战的唯一方法没有相应的成功。然后,Thanpetro工程团队提出了一个不寻常的解决方案,其中线填充过程分为8个泵送停止循环,以及在液相和气体相之间的机械屏障中使用聚氨酯猪。这项工作描述了管道概念设计的所有关键因素,用于调试程序和实施,以及用于预测流动条件和所有关键事件的工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号