首页> 外文会议>Japan-China Joint Nuclear Physics Sysmposium >Current progress of nuclear astrophysics study and BRIBF at CIAE
【24h】

Current progress of nuclear astrophysics study and BRIBF at CIAE

机译:CIAE核天体物理学研究和Bribf的当前进展

获取原文

摘要

A secondary beam line (GIRAFFE) at the Beijing Tandem accelerator lab was constructed for yielding low energy secondary beams. The current progress on the study of nuclear astrophysics and nuclear structure is presented. Up to now, We have carried out measurement of ~7Be(d,n) ~8B,~(11)C(d,n)~(12)N, ~8Li(d,p)~9Li, and ~6He(p,n)~6Li reactions. The proposed Beijing radioactive nuclear beam facility (BRIBF) and its current R&D progress are briefly introduced. This facility is based on the existing HI-13 tandem accelerator. A proton cyclotron will be built to provide 100 MeV 200 μA proton beam, together with an ISOL system and a super conducting heavy ion LINAC. By this facility, intensity of order of 10~9 pps radioactive nuclear beams (RNB) for mass up to A=120 will be produced.
机译:构建了北京串联加速器实验室的二次光束线(长颈鹿),用于产生低能量二次梁。提出了核天体物理学和核结构研究的进展。到目前为止,我们已经进行了〜7be(d,n)〜8b,〜(11)c(d,n)〜(12)n,〜8li(d,p)〜9li,〜6he( p,n)〜6li反应。简要介绍了拟议的北京放射性核束设施(Bribf)及其目前的研发进度。该设施基于现有的Hi-13串联加速器。将构建质子回旋龙,以提供100 meV200μA质子束,以及分离系统和超级导电的重离子线。通过该设施,将产生10〜9 PPS放射性核束(RNB)的阶数,将质量高达A = 120。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号