首页> 外文会议>Annual Conference for Young Scientists of China Association for Science and Technology >Procedure Strategy of Engineering Claims in the International Construction Contract Project
【24h】

Procedure Strategy of Engineering Claims in the International Construction Contract Project

机译:国际施工合同项目中工程索赔的程序和战略

获取原文

摘要

Engineering Claim is a powerless sector in China construction contract project management. According to the practical experience in the Indus Highway No.9 Contract Project in Pakistan, in this thesis the author discusses engineering claim work systematically, which including how come into being major reasons, ask for providing against works, follow the basic principles, abide by important procedures as well as adopt necessary strategy. It is beneficial to improve China construction industry administration level and make use of engineering claim rightly and to participate in international market competition as soon as possible, and furthermore, in accordance with development tide of current international construction contract project.
机译:工程索赔是中国建设合同项目管理的无能为力部门。根据巴基斯坦的Indus公路合约项目的实践经验,本文系统地讨论了工程索赔,系统地讨论了工程索赔,包括如何成为主要原因,要求遵守基本原则,遵循基本原则,遵循重要程序以及采用必要的策略。改善中国建筑行政管理水平并正确利用工程索赔,并尽快参与国际市场竞争,以及根据当前国际建筑合同项目的发展潮流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号