首页> 外文会议>NATO Advanced Study Institute on Risk Methodologies for Technological Legacies >Environmental Risk Assessment of Installations and Sites Inherited from the Cold War Period in Bulgaria
【24h】

Environmental Risk Assessment of Installations and Sites Inherited from the Cold War Period in Bulgaria

机译:从保加利亚冷战期内的装置和网站的环境风险评估

获取原文

摘要

Managing legacy waste risks often starts with effective use of resources. This chapter explains how one Eastern European country reorganized its resources to address issues of risk associated with new and existing facilities and contaminated sites. For example, they have moved chemical hazard expertise from military organizations to civilian authority. The chapter describes how they are analysing various types of risk and how they plan risk management efforts. The chapter further looks at how more democratic institutions are empowering the public to challenge government decisions and how information can be provided to the public in a way that allows them to join in its evaluation. A new national system of emergency response is also described.
机译:管理遗留废物风险通常从有效利用资源开始。本章介绍了一个东欧国家如何重组其资源,以解决与新现有设施和污染地点相关的风险问题。例如,他们已经将来自军事组织的化学危害专业知识传播到民间当局。本章介绍了如何分析各种风险以及它们如何计划风险管理努力。本章进一步了解更多的民主机构如何赋予公众挑战政府决定以及如何以允许他们加入其评估的方式向公众提供信息。还描述了新的国家应急响应系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号