首页> 外文会议>Combined Power Plant Air Pollutant Control Mega Symposium >On-site SCR Catalyst Rejuvenation Process as Part of a Catalyst Management Plan
【24h】

On-site SCR Catalyst Rejuvenation Process as Part of a Catalyst Management Plan

机译:现场SCR Catalyst重新活化过程作为催化剂管理计划的一部分

获取原文

摘要

The on-site catalyst rejuvenation process is a highly efficient tool to reduce operating and maintenance costs for life time extension of SCR catalyst compared to catalyst exchange and/or additional catalyst installation. Depending on the type of deactivation the process is fit to the requirements based on our experiences. Thus the tailor made process can handle deactivation types like pluggage, alkali and earth alkaline depositions, and more. One of the important constraints is to perform the rejuvenation on-site within the given outage of the boiler to reduce any additional costs and risks. We will present new results from rejuvenations performed on SCR catalysts from coal and oil fired units. A cost analysis compared to the additional catalyst installation will be given as part of a catalyst management plan.
机译:现场催化剂再活化过程是一种高效的工具,可以减少与催化剂交换和/或额外的催化剂安装相比SCR催化剂的终身时间延伸的操作和维护成本。根据停用类型,该过程适合根据我们的经验的要求。因此,裁缝制成的方法可以处理置物,碱和地球碱性沉积等失活类型,以及更多。其中一个重要的约束是在给定的锅炉中进行现场的复兴,以减少任何额外的成本和风险。我们将从煤炭和燃油机组的SCR催化剂上进行的恢复活力提出新的结果。与附加催化剂安装相比的成本分析将作为催化剂管理计划的一部分给出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号