In September 1985, a significant rainfall occurred in northern Wisconsin near the town of Port Wing. The event was so large that a significant amount of trees and brush washed downstream where it accumulated on the Orienta dam, including the tainter gate spillway. Once the operator reached this remote dam site, he found that the overflow spillway and tainter gates were blocked by an enormous amount of debris and were inoperable. The dam was soon overtopped, causing the left earthen embankment to fail with a large section washed downstream. Feasibility studies were performed to evaluate redevelopment of the dam and the damaged powerhouse and generating facilities. The evaluations did not result in the site being redeveloped. In 1996, Northern States Power (Xcel Energy) applied for an abandonment permit with the Wisconsin Department of Natural Resources (WDNR). Removal of the Orienta dam caused a variety of responses. Local residents both wanted the dam rebuilt and the reservoir restored and others wanted the dam permanently removed to restore a free flowing river. These local differences as well as concerns with fish and lamprey movement from Lake Superior to the upstream waters that had resident brook trout and a Federal cold water fish hatchery raised concerns with regards to the scope and configuration of the removal project. After a series of meetings with the Federal, State, and local agencies as well as the public, resolution for the final removal of the Orienta dam and abandonment and restoration of the site was established in 2001. Plans were developed for substantial removal of the dam and construction of a new fish and lamprey barrier to restrict movement of fish and lamprey from Lake Superior upstream to native trout waters. Only the dam foundation was to remain to allow construction of the fish and lamprey barrier. To insure that the lamprey barrier (of which the old dam acted as such) was intact for fish lamprey migrations, removal of the dam and subsequent installation of a barrier needed to be closely coordinated. In order to coordinate the engineering and construction, Xcel Energy partnered with the WDNR to use one engineering firm and one contractor to complete removal of the dam and construction of the barrier. Xcel Energy paid for the removal and construction of the fish and lamprey barrier was paid by the WDNR. This plan initiated teamwork that was critical to allow a coordinated, and timely completion of the project work in a cost effective manner. Explosives and conventional construction removal methods were used to remove the dam within a few months in the fall of 2001. This paper discusses the technical aspects of how the removal items were kept to a minimum and on-site disposal was maximized to provide an economic removal. This item included an agreed upon removal plan established between Owner, Agencies and Contractor. Although difficult, the use of a performance specification approach saved engineering and contractor costs that resulted in an acceptable product by all stakeholders.
机译:1985年9月,威斯康星州北部北部港口的北部发生了大量的降雨。该事件如此之大,大量的树木和刷子在下游洗过它积累在Orienta Dam上的下游,包括Tainter Gate Spillway。一旦操作员到达这个遥控器场所,他发现溢出溢洪道和织纳盖特被巨大的碎片阻挡,并且无法操作。大坝很快被拓展,导致左土石路堤失败,大部分在下游洗涤。进行可行性研究以评估大坝的重建和损坏的省力和发电机设施。评估没有导致该网站重新开发。 1996年,北方国家权力(XCEL能源)申请了威斯康星州自然资源部(WDNR)的遗弃许可。去除Orienta Dam导致各种反应。当地居民都希望大坝重建,水库恢复,其他人希望大坝永久拆除以恢复自由流动的河流。这些局部差异以及来自湖泊的鱼和羊毛喇叭运动的担忧与居民溪鳟鱼的上游水域和联邦冷水鱼类孵化场提高了拆除项目的范围和配置的关注。经过一系列与联邦,州和当地机构以及公众的会议,2001年成立了最终删除了东方大坝和遗弃和恢复该网站的决议。制定了大大拆除大坝的计划建设新的鱼和羊斑屏障,将鱼和羊斑的运动限制在高级上游到原生鳟鱼水域中。只有大坝基础才能留下来允许鱼和羊斑屏障的建设。为了确保为鱼类Lamprepy迁移的旧坝(老大坝采取的旧坝)的落物屏障(其中旧坝)完好无损,除去大坝并随后安装需要密切协调的障碍。为了协调工程和施工,Xcel Energy与WDNR合作,使用一个工程公司和一位承包商来完成大坝和屏障的构建。 XCER能量支付了用于拆除和施工的鱼和Lamprey障碍是由WDNR支付的。该计划启动了允许协调,并及时完成项目工作以成本效益的方式至关重要的团队合作。爆炸物和常规施工去除方法用于在2001年下降的几个月内去除大坝。本文讨论了如何将拆卸物品保持在最低和现场处置的技术方面最大化,以便提供经济拆除。此项目包括在所有者,机构和承包商之间建立的拆除计划的商定。虽然困难,使用性能规范方法的使用保存了所有利益相关者导致可接受的产品的工程和承包商成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号