首页> 外文会议>POWER-GEN International Conference >Leveraging Technology to Improve Equipment Utilization and Reduce Cost(PPT)
【24h】

Leveraging Technology to Improve Equipment Utilization and Reduce Cost(PPT)

机译:利用技术提高设备利用率,降低成本(PPT)

获取原文

摘要

Challenges to Productivity: 1.Jobs last longer.2.Jobs are more complex.3.Owners Demanding.4.Scope Creep.5.Slow to invest in and adopt new tech.6.Workforce Issues.Improving Utilization:Real Time Alerts 1.Notification Types.1.1 Pending Due Notifications.1.2 Past Due Alerts.1.3 Low Utilized Equipment.2.Targeted Email Notifications.2.1 Requestors.3.Actionable”Live Links”.3.1 Extend Rentals.3.2 Request Pickup.Ethylene plant development project: Phase I: 1.Each subcontractor was responsible for equipment.2.Overcrowded site.3.Multiple sales,delivery and service vehicles.4.Price constancy issues.5.Middle markup.6.Duplicate and underutilized equipment.Phase II: 1.CM manages equipment.2.Reduce traffic.3.Consistent and accurate billing.4.Improve cost position for owner.5.Share equipment across subcontractors.6.Proactive consumption management.7.Quantifiable cost savings in first two months.
机译:挑战的生产力:1.Jobs持续更长.2.jobs是更复杂的.3.OWNERS要求.4.Scope Creep.5.Slow投资并采用新的Tech.6.workforce问题。实时提醒1 .Notification类型.1。待申请通知.1.2过去的适销设备.1.2低利用设备.2. 4.2。请求者.3。Acceptable“Live Links”.3.2扩展租赁.3.2要求拾取。 i:1.家务监督者负责设备.2.Proverded Site.3.3.3.3.Price恒定问题.5.Middle Markup.6.Duplicate和未充分利用的设备。Pase II:1.CM管理设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号