首页> 外文会议>ASME Turbo Expo >SYNGAS FUEL HYBRID 45 MW GTCC/ORC POWER PLANT USING MODULAR 500 TPD COAL/BIOMASS MODULAR PYROLYTIC GASIFICATION
【24h】

SYNGAS FUEL HYBRID 45 MW GTCC/ORC POWER PLANT USING MODULAR 500 TPD COAL/BIOMASS MODULAR PYROLYTIC GASIFICATION

机译:合成气燃料杂交45 MW GTCC / ORC电厂使用模块化500 TPD煤/生物质模块化热解气化

获取原文

摘要

This paper presents a solution for developing economies where power shortages require power plants in the range of 30/50 MW or larger to support industrial facilities such as mining or industrial parks where natural gas is not available and where diesel fuel is expensive, but where coal is readily available. Recent developments with Pyrolytic gasification systems by Wiley Consulting, capable of modular 500tpd of coal or biomass, were investigated for power starved sub-Saharan African countries. This Gasifier does not require an oxygen plant and produces a Syngas that can be combusted in modified FR6B gas turbines. The Syngas needs to be compressed and the parasitic load is accommodated with steam injection for NO_x control and power enhancement to power the fuel gas compressor. To simplify the exhaust heat power recovery, the Cascading Closed Loop Cycle (CCLC) Organic Rankine Cycle (ORC) system was integrated into this system, resulting in a nominal 45 MW coal or biomass power plant at altitudes over 1000m achieving 40%+ efficiency. Coal fired steam plant Rankine cycle was considered expensive and inefficient due to the requirements of low emissions as well as more than 70% of the fuel energy rejected in the condensing system. Using the Gas Turbine Brayton cycle to combust Synthesis Gas (produced by an innovative Pyrolytic and modular gasification process that did not need an oxygen plant) was considered a practical alternative, especially as the Gas Turbine is air cooled. To fully capture the value of the Syngas fuel, the Gas Turbine exhaust energy would be recovered in an ORC which avoided the use of water and provided excellent load following characteristics as well as the capability to turndown to 40% or lower loads. The criteria established for the power plant was to build and commission the plant in 24 months or less. This necessitated looking at available used and refurbished generating equipment. The modular Gasifier, already demonstrated as a 250 tpd system, could readily be scaled to 500 tpd coal or biomass with about the same footprint and dispatched in modules for fast installation. The availability of a used 38 MW class GT for refurbishment and modification to Syngas fuel combustion system allowed site installation within one year and the provision of emergency power using available diesel fuel. This paper will fully describe the 45 MWe Hybrid GT/ORC Combined Cycle power plant utilizing the innovative Pyrolytic coal gasification process as the fuel source for an efficient low emissions power supply.
机译:本文提出了发展中经济体,其中电力短缺要求电厂在30/50兆瓦或更大的范围内,支持工业设施如采矿或工业园区,其中天然气是不可用的解决方案,其中柴油燃料是昂贵的,但如果煤更是一应俱全。由威利咨询,能够煤或生物质的模块化500tpd的热解气化系统的最新发展,进行了调查权力饿死撒哈拉以南非洲国家。本气化炉不需要氧气植物和产生可以在改性FR6B燃气轮机中燃烧合成气。合成气需要压缩和寄生负载被容纳与蒸汽注入中NO_x控制和功率增强功率的燃料气体压缩机。为了简化排气热动力回收,级联闭环循环(CCLC)有机朗肯循环(ORC)系统集成到该系统中,产生了标称45 MW煤或生物质发电设备在超过1000m高度达到40%+效率。燃煤蒸汽植物朗肯循环被认为是昂贵和低效的由于低排放的要求作为燃料的能量以及超过70%,在冷凝系统拒绝。使用燃气轮机Brayton循环燃烧合成气(由一个创新的热解和气化的模块化的过程,并不需要氧植物产生的)被认为是一个实际的选择方案,特别是当燃气轮机是空气冷却。完全捕捉合成气燃料的值时,燃气涡轮机排气能量将在ORC其中避免使用水和下列特性以及能力来调低至40%或更低的负载提供了极好的负荷来回收。为电厂制定的标准是建立在24个月或更少的委托工厂。这需要看的二手和翻新发电设备。模块化气化炉,已证明是一个250 TPD系统,可以很容易地扩展到500 TPD煤或生物质与大约相同的尺寸和在快速安装模块分派。二手38兆瓦级燃气轮机进行整修和改装,以合成气燃料燃烧系统使现场安装一年内的可用性和应急电源的使用可用柴油的供应。本文将充分地描述45兆瓦混合GT /利用创新的热解煤的气化过程,作为一个有效的低排放电源燃料源ORC联合循环发电设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号