首页> 外文会议>ASME Turbo Expo >INLET FOGGING FOR A 655 MW COMBINED CYCLE POWER PLANT- DESIGN, IMPLEMENTATION AND OPERATING EXPERIENCE
【24h】

INLET FOGGING FOR A 655 MW COMBINED CYCLE POWER PLANT- DESIGN, IMPLEMENTATION AND OPERATING EXPERIENCE

机译:入口雾化655 MW联合循环电厂 - 设计,实施和操作经验

获取原文

摘要

The design, installation, commissioning and operation of a fogging system for a large 655 MW combined cycle power plant is described. Technical details and practical installation issues are discussed. Special considerations as to how the fogging system could help in the augmentation of power during high temperature and low frequency operation of the gas turbine is discussed. Finally a discussion is made regarding the importance of inlet filtration and the proper selection of blade coatings.
机译:描述了大型655 MW联合循环发电厂的雾化系统的设计,安装,调试和操作。讨论了技术细节和实际安装问题。讨论了雾化系统如何在高温和燃气轮机的低频操作期间如何帮助雾化系统如何帮助的特殊考虑。 Finally a discussion is made regarding the importance of inlet filtration and the proper selection of blade coatings.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号